S.R. CEN ISO TS 15877-7:2009
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - CHLORINATED POLY(VINYL CHLORIDE) (PVC-C) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY
Hardcopy , PDF
25-01-2019
English
01-01-2009
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 Requirements
Bibliography
Provides guidance for the assessment of conformity included in the manufacturer's quality plan as part of his/her quality system.
DevelopmentNote |
Supersedes I.S. EN ISO/TS 15877-7. (10/2009)
|
DocumentType |
Standard
|
Pages |
26
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
ISO/TS 15877-7:2009 | Identical |
CEN ISO/TS 15877-7:2009 | Identical |
ISO/IEC 17025:2005 | General requirements for the competence of testing and calibration laboratories |
ISO 3951-1:2013 | Sampling procedures for inspection by variables — Part 1: Specification for single sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection for a single quality characteristic and a single AQL |
ISO/IEC 17021:2011 | Conformity assessment Requirements for bodies providing audit and certification of management systems |
ISO 15877-3:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 3: Fittings |
ISO 15877-2:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 2: Pipes |
ISO 15877-1:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 1: General |
ISO 15877-5:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 5: Fitness for purpose of the system |
ENV 12108:2001 | Plastics piping systems - Guidance for the installation inside buildings of pressure piping systems for hot and cold water intended for human consumption |
ISO 9001:2015 | Quality management systems — Requirements |
ISO 9000:2015 | Quality management systems — Fundamentals and vocabulary |
ISO/IEC Guide 65:1996 | General requirements for bodies operating product certification systems |
ISO 3951-2:2013 | Sampling procedures for inspection by variables — Part 2: General specification for single sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection of independent quality characteristics |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.