SAE AIR5320A
Current
The latest, up-to-date edition.
Summary of Icing Simulation Test Facilities
Hardcopy , PDF
English
25-09-2015
1. SCOPE
2. REFERENCES
3. TERMINOLOGY
4. SURVEY
5. DESCRIPTION OF SUMMARY TABLES
6. SUMMARY
This SAE Aerospace Information Report (AIR) contains information on most of the major icing simulation ground facilities.
DocumentType |
Standard
|
Pages |
41
|
ProductNote |
THIS STANDARD IS STABILIZED
|
PublisherName |
SAE International
|
Status |
Current
|
Supersedes |
This SAE Aerospace Information Report (AIR) contains information on most of the major icing simulation ground facilities. An effort was made to obtain data from as many facilities as possible over a two year time period. The data in this document represents the state of the facilities in calendar year 1996. Facilities are constantly changing and upgrading and, therefore, some facility specifications may change during the life of this report.Of the 27 facilities described in this report, the primary use is split with approximately half for engine testing and half for wind tunnel testing. The facilities are limited to ground facilities and, therefore, icing tankers have not been included.
SAE ARP5905 | Calibration and Acceptance of Icing Wind Tunnels |
SAE ARD 50066 : 1996 | AIRCRAFT ICING DIRECTORY |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.