SAE ARP 5107 : 2006
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
GUIDELINES FOR TIME-LIMITED-DISPATCH (TLD) ANALYSIS FOR ELECTRONIC ENGINE CONTROL SYSTEMS
12-11-2018
01-01-2006
1 SCOPE
1.1 Purpose
1.2 Summary of Revision
1.3 Field of Application
2 REFERENCES
2.1 Applicable Documents
2.1.1 FAA Publications
2.1.2 EASA Publications
2.2 Acronyms and Symbols
3 APPLICABILITY
4 HISTORICAL PERSPECTIVE
5 HISTORY OF INTEGRITY GUIDELINES
6 GENERAL ANALYSIS APPROACH
6.1 FADEC System Configuration
6.2 Repair Categories: Immediate, Short, and Long Time
6.3 Classification of FADEC Fault Types
6.3.1 No Dispatch (ND) Type Faults
6.3.2 Short Time (ST) Type Faults
6.3.3 Long Time (LT) Type Faults
6.3.4 Combinations of Faults and Uncovered (UC) Faults
6.3.5 Aircraft Related Information
6.4 Recommendations an Items Considered Part of the FADEC
System
7 CALCULATION APPROACHES: SINGLE ENGINE ANALYSIS
7.1 A Simple Time-Averaging Approach
7.1.1 LOTC Rate for Full-up Electronics
7.1.2 Average LOTC Rate for Short Time (ST) Faults
7.1.3 Average LOTC Rate for Long Time (LT) Faults
7.1.4 Calculations of the Average LOTC Rate Using the TWA
Approach
7.1.5 An Example Calculation
7.2 Markov Model Approach
7.2.1 Open Loop Markov Models
7.2.2 Closed Loop Markov Model Approach
7.2.3 Examples of Single Fault States
7.2.4 Acceptability (and Accuracy) of Single State Models
7.3 Comparison of TWA and MM Approaches
7.4 A Single State FADEC System MM Example
7.4.1 Description of the Excel Spread Sheet Data
7.4.2 Validity of the Calculated Data
7.5 Second Example: A Single and Dual State Model of a FADEC
System
7.6 Discussion of Markov Model and TWA Approaches, and the Use
of Fault Trees for Determining LOTC Rates Men Operating
With Faults
7.7 Time-Since-Fault (i.e., On-Condition) Repair Versus
Periodic Inspection and Repair
8 CALCULATION APPROACHES: DUAL ENGINE ANALYSIS
8.1 Time-Averaging Approach
8.2 Maximum Specific Risk Failure Rates as a Function of
Dispatch Configuration
9 SUMMARY
APPENDIX A EARLY APPLICATIONS
APPENDIX B REVISED FAA ANE POLICY LETTER, ANE-1993-33.28TLD-R1,
DATED JUNE 29, 2001, POLICY FOR TIME LIMITED DISPATCH
(TLD) OF ENGINES FITTED WITH FULL AUTHORITY DIGITAL
ENGINE CONTROLS (FADEC) SYSTEMS
APPENDIX C DISCUSSION OF SOME TYPICAL FADEC SYSTEM FAULTS
AND THEIR APPLICABILITY TO THE LOTC ANALYSIS
APPENDIX D DISCUSSION OF THE MMEL, DDG, CMRS, AND THEIR
RELATIONSHIP TO FADEC SYSTEM MAINTENANCE
(THE HANDLING OF ND, ST, AND LT FAULTS)
APPENDIX E PROBABILITY OF A DUAL ENGINE FAILURE WITH DIVERSION
AND TURNBACK
APPENDIX F A REVIEW OF THE COEFFICIENTS USED IN THE
TIME-WEIGHTED-AVERAGE (TWA) EQUATION, ALONG WITH A
DISCUSSION OF (1) THE COEFFICIENTS USED IN A SINGLE
STATE MARKOV MODEL, WHICH MAINTAINS ALL OF THE SINGLE
ST AND LT STATES AS SEPARATE STATES, AND (2) THE
COEFFICIENTS OF A SINGLE STATE MARKOV MODEL, WHICH
COMBINES ALL ST AND LT FAULTS INTO A SINGLE (AVERAGE)
ST AND LT STATE
APPENDIX G MEN IS A SINGLE STATE MODEL OK?
APPENDIX H COMPARISON OF THE ASYMPTOTIC VALUE OF {(dP/dt)/(1 - P)}
IN AN OPEN LOOP MARKOV MODEL WITH THAT OF THE AVERAGE
FAILURE RATE OF THE SYSTEM FROM A CLOSED
LOOP MARKOV MODEL
Provides methodologies and approaches which have been used for conducting and documenting the analyses associated with the application of Time Limited Dispatch (TLD) to the thrust control reliability of Full Authority Digital Electronic Control (FADEC) systems.
Committee |
E-36
|
DocumentType |
Standard
|
PublisherName |
SAE International
|
Status |
Superseded
|
SupersededBy |
SAE ARP 5757 : 2016 | GUIDELINES FOR ENGINE COMPONENT TESTS |
SAE AIR 5924 : 2013 | GUIDELINES FOR THE INTEGRATION OF ELECTRONIC ENGINE CONTROL SYSTEMS FOR TRANSPORT CATEGORY (PART 25) AND GENERAL AVIATION (PART 23) AIRCRAFT |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.