SAE AS4114A
Current
The latest, up-to-date edition.
Production Test Plan for the Time Division Command/Response Multiplex Data Bus Bus Controllers
Hardcopy , PDF
English
14-08-2017
1. SCOPE
2. APPLICABLE DOCUMENTS
3. DEFINITIONS
4. GENERAL TEST REQUIREMENTS
5. DETAILED REQUIREMENTS
APPENDIX A - TEST PLAN CHANGES FOR MIL-STD-1553B,
NOTICE 2 BCS
This test plan consists of two major sections for the production testing of bus controllers: Electrical tests and Protocol tests.
DocumentType |
Standard
|
Pages |
35
|
ProductNote |
This version is now stabilized.
|
PublisherName |
SAE International
|
Status |
Current
|
Supersedes |
This test plan consists of two major sections for the production testing of bus controllers: Electrical tests and Protocol tests.
SAE AS42702 | Verification Methods for MIL-STD-1760E Mission Stores |
SAE AS 4113 : 1989 | VALIDATION TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS BUS CONTROLLERS |
MIL-STD-1553 Revision B:1978 | DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.