• Shopping Cart
    There are no items in your cart

SAE AS7110/11A

Current

Current

The latest, up-to-date edition.

National Aerospace and Defense Contractors Accreditation Program Requirements for Gas Arc Fusion Spot Welding

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

06-03-2007

€67.84
Excluding VAT

1 SCOPE
2 REFERENCES
3 REFERENCE REQUIREMENTS
4 MATERIALS/MATERIAL CONTROL
5 EQUIPMENT CONTROL
6 QUALIFICATION
7 PROCESS CONTROL
8 INSPECTION AND ACCEPTANCE CRITERIA
9 COMPLIANCE

Pertains to suppliers seeking NADCAP accreditation for gas tungsten arc fusion spot welding.

DocumentType
Standard
Pages
5
PublisherName
SAE International
Status
Current
Supersedes

This document has been declared \"CANCELLED\" as of March 2007 and has been superseded by PRI AC7110/11. By this action, this document will remain listed in the Numerical Section of the Aerospace Standards Index noting that it is superseded by PRI AC7110/11. Cancelled specifications are available from SAE.

SAE AS 7110 : 2003 NADCAP REQUIREMENTS FOR WELDING/BRAZING

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.