SCTE 212 : 2015
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
CABLE OPERATOR ENERGY AUDIT FRAMEWORK AND ESTABLISHMENT OF ENERGY BASELINE
Published date
30-03-2015
Publisher
Superseded date
17-11-2021
Superseded by
Sorry this product is not available in your region.
NOTICE
1. Scope
2. Normative References
3. Informative References
4. Compliance Notation
5. Abbreviations and Definitions
6. Framework
7. Data Collection Definition and Frequency
8. Summary
Specifies how cable operators should audit power consumption and accurately establish an energy baseline for inside and outside plant excluding any customer powered equipment.
| DocumentType |
Standard
|
| PublisherName |
Society of Cable Telecomm Engineers
|
| Status |
Superseded
|
| SupersededBy |
| SCTE 238 : 2017 | OPERATIONAL PRACTICE FOR MEASURING AND BASELINING POWER CONSUMPTION IN OUTSIDE PLANT EQUIPMENT AND POWER SUPPLIES |
| SCTE 219 : 2015 | TECHNICAL FACILITY CLIMATE OPTIMIZATION METHODOLOGY |
Summarise
Sorry this product is not available in your region.