• Shopping Cart
    There are no items in your cart

SCTE 212 : 2015

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

CABLE OPERATOR ENERGY AUDIT FRAMEWORK AND ESTABLISHMENT OF ENERGY BASELINE

Superseded date

17-11-2021

Superseded by

ANSI/SCTE 212:2020

Published date

30-03-2015

Sorry this product is not available in your region.

NOTICE
1. Scope
2. Normative References
3. Informative References
4. Compliance Notation
5. Abbreviations and Definitions
6. Framework
7. Data Collection Definition and Frequency
8. Summary

Specifies how cable operators should audit power consumption and accurately establish an energy baseline for inside and outside plant excluding any customer powered equipment.

DocumentType
Standard
PublisherName
Society of Cable Telecomm Engineers
Status
Superseded
SupersededBy

SCTE 238 : 2017 OPERATIONAL PRACTICE FOR MEASURING AND BASELINING POWER CONSUMPTION IN OUTSIDE PLANT EQUIPMENT AND POWER SUPPLIES
SCTE 219 : 2015 TECHNICAL FACILITY CLIMATE OPTIMIZATION METHODOLOGY

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.