SCTE 81 2018
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Surge Withstand Test Procedure
Hardcopy
English
01-12-2018
29-10-2025
This document describes a procedure for subjecting a broadband device to surge conditions as specified in
IEEE C62.45. Ports shall be tested in compliance with IEEE C62.45 Category B Combination Waveform or IEEE C62.45 Category A Ring Waveform as specified for the Device Under Test.
| DocumentType |
Standard
|
| Pages |
0
|
| PublisherName |
Society of Cable Telecomm Engineers
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| SCTE 296:2025 | Full Duplex DOCSIS Broadband Radio Frequency Hardline Amplifiers for Cable Systems |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.