SN EN 12953-4 : 2002
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
SHELL BOILERS - PART 4: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER
01-09-2018
12-01-2013
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 General requirements
5.1 General
5.2 Material identification
5.3 Cylindrical shells
5.4 Tell-tale holes
5.5 End plates and tube plates
5.6 Plain tubes and stay tubes
5.7 Manhole frames and openings
5.8 Connections for mountings
5.9 Cylindrical furnaces
5.10 Water-cooled reversal chamber
5.11 Stays
5.12 Design of welded joints
5.13 Openings in or adjacent to welds
5.14 Fillet Welds
5.15 Fabrication
5.16 Post-weld heat treatment and other heat treatments
Annex A (informative) Typical examples of acceptable weld
details
Annex ZA (informative) Clauses of this European Standard
addressing essential requirements or other provisions
of EU Directives
Bibliography
Defines requirements for the workmanship and construction of shell boilers as defined in EN 12953-1.
DocumentType |
Standard
|
PublisherName |
Swiss Standards
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
BS EN 12953-4:2002 | Identical |
UNE-EN 12953-4:2003 | Identical |
DIN EN 12953-4:2002-08 | Identical |
EN 12953-4:2018 | Identical |
NBN EN 12953-4 : 2002 | Identical |
NF EN 12953-4 : 2002 | Identical |
I.S. EN 12953-4:2002 | Identical |
UNI EN 12953-4 : 2005 | Identical |
ONORM EN 12953-4 : 2018 | Identical |
NEN EN 12953-4 : 2018 | Identical |
NS EN 12953-4 : 2018 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.