• There are no items in your cart

SN EN 14587-1 : 2007

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

RAILWAY APPLICATIONS - TRACK - FLASH BUTT WELDING OF RAILS - PART 1: NEW R220, R260, R260MN AND R350HT GRADE RAILS IN A FIXED PLANT

Withdrawn date

01-08-2019

Superseded by

SN EN 14587-1:2019

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Quality management system
5 Requirements for the welding process
   5.1 General
   5.2 Clamping force
   5.3 Pre-heating
   5.4 Flashing
   5.5 Upsetting
   5.6 Upset current
   5.7 Unclamping
   5.8 Welding parameters
   5.9 Steps across the weld
   5.10 Removal of excess upset
   5.11 Post-weld heat treatment
   5.12 Rail end preparation and horizontal alignment
        requirements
6 Procedure approval
   6.1 General
   6.2 Information to be supplied by the purchaser
   6.3 Sample preparation
   6.4 Approval tests
        6.4.1 Visual inspection
        6.4.2 Weld trimming
        6.4.3 Weld straightness and flatness
        6.4.4 Magnetic particle or dye penetrant inspection
        6.4.5 Bend testing
        6.4.6 Macro examination
        6.4.7 Micro examination
        6.4.8 Hardness testing
        6.4.9 Fatigue testing
   6.5 Test result report
7 Approval of other rail profiles or grades
   7.1 General
   7.2 Sample preparation
   7.3 Approval tests
   7.4 Test result report
8 Approval of the Welding Contractor
   8.1 General
   8.2 Welding procedure
   8.3 Operators
   8.4 Supervision
   8.5 Weld Inspection
   8.6 Equipment
9 Weld production following procedure approval
   9.1 Weld production
   9.2 Information to be supplied by the purchaser
   9.3 Rail end preparation and horizontal rail alignment
        requirements
   9.4 Weld parameter monitoring
   9.5 Weld identification
   9.6 Visual inspections
   9.7 Steps across the weld
   9.8 Finishing
        9.8.1 Correction of vertical and horizontal weld
               alignment
        9.8.2 Profile finishing of the rail head
   9.9 Weld straightness and flatness
   9.10 Bend testing
        9.10.1 General
        9.10.2 Additional bend test
        9.10.3 Bend test procedure
        9.10.4 Interpretation of results
        9.10.5 Retesting
   9.11 Documentation
Annex A (normative) Bend test requirements
Annex B (normative) Test weld fracture faces - Recording
        of defects
Annex C (normative) Fatigue test method for flash butt welds
  C.1 Scope
  C.2 Test equipment
  C.3 Calibration procedure
      C.3.1 General
      C.3.2 Test piece
      C.3.3 Test piece preparation
      C.3.4 Instrumentation
      C.3.5 Procedure
  C.4 Fatigue test method
      C.4.1 General
      C.4.2 Staircase testing method
      C.4.3 Example of the data analysis of a fatigue
            strength determination by the staircase method
      C.4.4 Past-the-post testing method
Annex D (normative) Macro examination and micro examination
  D.1 Macro examination
  D.2 Micro examination
Annex E (normative) Hardness testing
Bibliography

Describes requirements for the approval of a welding process in a fixed plant, together with the requirements for subsequent welding production.

DocumentType
Standard
PublisherName
Swiss Standards
Status
Withdrawn
SupersededBy

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.