• Shopping Cart
    There are no items in your cart

SR 3581 : ISSUE 2

Current

Current

The latest, up-to-date edition.

GR-303 OPERATIONS MIGRATION STRATEGY

Published date

12-01-2013

Sorry this product is not available in your region.

Issue 1 of this special report gave the initial view of the migration plan and firmly established the need to transition GR-303-CORE, "Integrated Digital Loop Carrier System Generic Requirements, Objectives, and Interface", to a standards-based, TMN-compatible operations environment. Issue 2 documents the current state of the GR-303 stakeholder discussions regarding the migration strategy by identifying the existing agreements as well as open items, and also continues to develop the operations migration strategy that guides GR-303 integrated access system products and their managing systems through the introductory stage and two widespread deployment.

DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current

GR 2833 ILR : ISSUE 3A GENERIC OPERATIONS INTERFACES USING OSI TOOLS: INFORMATION MODEL FOR IDLC AND FITL SYSTEMS ISSUES LIST REPORT
GR 2833 CORE : ISSUE 3 REV 2 GENERIC OPERATIONS INTERFACES USING OSI TOOLS: INFORMATION MODEL FOR INTEGRATED DIGITAL LOOP CARRIER AND FIBER IN THE LOOP SYSTEMS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.