• Shopping Cart
    There are no items in your cart

SR 3989 : ISSUE 1

Current

Current

The latest, up-to-date edition.

FRAME RELAY OVER ATM TEST PLAN

Published date

12-01-2013

Sorry this product is not available in your region.

1 Introduction
         1.1 Document Organization
2 Test Suite Overview
         2.1 Test Cases
3 Test Descriptions
         3.1 Test Configuration
         3.2 Timing Architecture
         3.3 Test Cases
               3.3.1 Frame Relay Service Specific
                         Convergence Sublayer Tests
                           3.3.1.1 Test Number: 1.1 -
                                       FR_SSCS_PDU Structure and Coding
                           3.3.1.2 Test Number: 1.2 -
                                       C/R Field Transparency
                           3.3.1.3 Test Number: 1.3 -
                                       EA Field Coding
                           3.3.1.4 Test Number : 1.4 -
                                       FECN Field
                           3.3.1.5 Test Number: 1.5 -
                                       BECN Field
                           3.3.1.6 Test Number: 1.6 -
                                       Discard Eligibility and
                                       CLP Mapping - Mode 1
                           3.3.1.7 Test Number: 1.7 -
                                       Discard Eligibility and
                                       CLP Mapping - Mode 2
                           3.3.1.8 Test Number: 1.8 -
                                       Connection Assignment Process
                           3.3.1.9 Test Number: 1.9 -
                                       Connection Removal Process
                           3.3.1.10 Test Number: 1.10 -
                                       Connection Activation and
                                       Deactivation Processes
                           3.3.1.11 Test Number: 1.11 -
                                       FR_SSCS_SDU delivery order
                           3.3.1.12 Test Number: 1.12 -
                                       AAL5 PDU delivery order
                           3.3.1.13 Test Number: 1.13 -
                                       Invalid and Inactive DLCIs
                           3.3.1.14 Test Number: 1.14 -
                                       FR_SSCS_PDU Payload Length
                 3.3.2 Service Interworking Parameter Mapping Tests
                           3.3.2.1 Test Number: 2.1 - Frame Relay
                                       Information Field Mapping
                           3.3.2.2 Test Number: 2.2 - Mode 1
                                       Loss Priority Mapping - FR to ATM
                           3.3.2.3 Test Number: 2.3 - Mode 1
                                       Loss Priority Mapping - ATM to FR ATM to FR
                           3.3.2.4 Test Number: 2.4 - Mode 2
                                       Loss Priority Mapping - FR to ATM
                           3.3.2.5 Test Number: 2.5 - Mode 2
                                       Loss Priority Mapping - ATM to FR
                           3.3.2.6 Test Number: 2.6 - Loss Priority
                                       Mapping Configurability
                           3.3.2.7 Test Number: 2.7 - Forward
                                       Congestion Indication Mapping -
                                       FR to ATM
                           3.3.2.8 Test Number: 2.8 - Forward
                                       Congestion Indication Mapping -
                                       ATM to FR
                           3.3.2.9 Test Number: 2.9 - Backward
                                       Congestion Indication Mapping
                           3.3.2.10 Test Number: 2.10 -
                                       C/R Field Mapping
                           3.3.2.11 Test Number: 2.11 - DLCI to
                                       VPI/VCI One-to-One Mapping
                 3.3.3 AAL5 Common Part Protocol Tests
                           3.3.3.1 Test Number: 3.1 - AAL5 PDU
                                       Length Check
                           3.3.3.2 Test Number: 3.2 - Insertion of
                                       padding octets in AAL5 PDU
                           3.3.3.3 Test Number: 3.3 - CPCS
                                       User-to-User field
                           3.3.3.4 Test Number: 3.4 - CPCS CPI field
                           3.3.3.5 Test Number: 3.5 - CPCS Length
                                                          field
                           3.3.3.6 Test Number: 3.6 - CPCS CRC field
                           3.3.3.7 Test Number: 3.7 - Segmentation
                                       of the CPCS PDU
                           3.3.3.8 Test Number: 3.8 - PT Field
                                                          encoding
                           3.3.3.9 Test Number: 3.9 - PT Field
                                                          decoding
                           3.3.3.10 Test Number: 3.10 -
                                       Max_SDU_Deliver_Length AAL5
                                       Parameter
                           3.3.3.11 Test Number: 3.11 - CPCS PDU
                                       User Abort Check
                           3.3.3.12 Test Number: 3.12 - Additional
                                       CPCS PDU Length Check
                           3.3.3.13 Test Number: 3.13 - Reassembly
                                       Timer Time-out
                           3.3.3.14 Test Number: 3.14 - CPAAL5
                                       Performance Measurements
                 3.3.4 Traffic Management Parameter Mapping Tests
                           3.3.4.1 Test Number: 4.1 - One-to-One,
                                       Method 1, PCR Parameter Mapping
                           3.3.4.2 Test Number: 4.2 - One-to-One,
                                       Method 1, CLP=0 SCR and MBS
                                       Parameter Mappings
                           3.3.4.3 Test Number: 4.3 - One-to-One,
                                       Method 1, CLP=1 SCR and MBS
                                       Parameter Mappings
                           3.3.4.4 Test Number: 4.4 - One-to-One,
                                       Method 2, Option 1, PCR
                                       Parameter Mapping
                           3.3.4.5 Test Number: 4.5 - One-to-One,
                                       Method 2, Option 1, CLP=0 SCR and
                                       MBS Parameter Mappings
                           3.3.4.6 Test Number: 4.6 - One-to-One,
                                       Method 2, Option 2, PCR
                                       Parameter Mapping
                           3.3.4.7 Test Number: 4.7 - One-to-One,
                                       Method 2, Option 2, CLP=0 SCR
                                       and MBS Parameter Mappings
                 3.3.5 PVC Management for Network Interworking
                           3.3.5.1 Test Number: 5.1 - Q.933 Annex A
                                       Procedures at the FR UNI
                           3.3.5.2 Test Number: 5.2 - Q.933 Annex A
                                       Bidirectional Procedures at the
                                       ATM Interface of the IWF
                           3.3.5.3 Test Number: 5.3 - Q.933 Annex A
                                       Asynchronous STATUS Message
                                       Support at the ATM Interface of
                                       the IWF
                           3.3.5.4 Test Number: 5.4 - PVC Segment
                                       Outage Detection
                           3.3.5.5 Test Number: 5.5 - Status
                                       Signaling Directional Independence
                           3.3.5.6 Test Number: 5.6 - PVC Status
                                       Reflected Through F5 OAM Flows
                 3.3.6 PVC Management for Network Interworking
                           3.3.6.1 Test Number: 6.1 - Q.933 Annex A
                                       Procedures at the FR UNI
                           3.3.6.2 Test Number: 6.2 - AIS F5 OAM
                                       Cell Generation Due to FR
                                       Service Affecting Condition
                           3.3.6.3 Test Number: 6.3 - Stopping AIS
                                       F5 OAM Cell Generation When an FR
                                       Service Affecting Condition Is
                                       Cleared
                           3.3.6.4 Test Number: 6.4 - New PVC
                                       Indication at the FR Interface
                           3.3.6.5 Test Number: 6.5 - Deleted PVC
                                       Indication at the FR Interface
                           3.3.6.6 Test Number: 6.6 - AIS F5 OAM
                                       Cell Generation Due to Inactive
                                       FR PVC
                           3.3.6.7 Test Number: 6.7 - ATM PVC to
                                       FR PVC Status Mapping
                           3.3.6.8 Test Number: 6.8 - New ATM
                                       PVC Reporting at FR Interface
                           3.3.6.9 Test Number: 6.9 - Deleted
                                       ATM PVC Reporting at FR Interface
                           3.3.6.10 Test Number: 6.10 - Additional
                                       ATM Service Affecting Conditions
                 3.3.7 Upper Layer User Protocol Encapsulation
                           3.3.7.1 Test Number: 7.1 - PVC
                                       Configuration Choice for
                                       Transparent Mode of Operation
                           3.3.7.2 Test Number: 7.2 - Transparent
                                       Mode of Operation
                           3.3.7.3 Test Number: 7.3 - PVC
                                       Configuration Choice for
                                       Translation Mode of Operation
                           3.3.7.4 Test Number: 7.4 - Bridged PDU
                                       Translation
                           3.3.7.5 Test Number: 7.5 - Errored RFC
                                       1490 Bridged PDU Handling
                           3.3.7.6 Test Number: 7.6 - Errored RFC
                                       1483 Bridged PDU Handling
                           3.3.7.7 Test Number: 7.7 - Routed PDU
                                       Translation
                           3.3.7.8 Test Number: 7.8 - Errored RFC
                                       1490 Routed PDU Handling
                           3.3.7.9 Test Number: 7.9 - Errored RFC
                                       1483 Routed PDU Handling
                           3.3.7.10 Test Number: 7.7 - Connection-
                                       Oriented PDU Translation
                           3.3.7.11 Test Number: 7.11 - Errored RFC
                                       1490 Connection-Oriented PDU
                                       Handling
                           3.3.7.12 Test Number: 7.12 - Errored RFC
                                       1483 Connection-Oriented PDU
                                       Handling
                           3.3.7.13 Test Number: 7.13 - Fragmented
                                       Packet Reassembly
                           3.3.7.14 Test Number: 7.14 - Detection of
                                       Errors in Fragmented Packet
                                       Streams
                           3.3.7.15 Test Number: 7.15 - Fragmentation
                                       due to Packet Larger than
                                       Max Frame Size
                           3.3.7.16 Test Number: 7.16 - FR ARP to
                                       ATM ARP PDU Mapping
4 Test Configurations
         4.1 Test Configuration Figures
References

Describes individual test cases that can be executed to determine a product's conformance to Frame Relay over ATM requirements. Frame Relay/Asynchronous Transfer Mode (ATM) interworking is a key capability for broadband Network Elements (NEs). Both services are growing and will coexist for some time. Frame Relay is based on variable length frames, and ATM is based on fixed size cells.

DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current

GR 1113 CORE : ISSUE 1 ASYNCHRONOUS TRANSFER MODE (ATM) AND ATM ADAPTATION LAYER (AAL) PROTOCOLS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.