TA NWT 000406 : ISSUE 2
Current
Current
The latest, up-to-date edition.
DC BULK POWER SYSTEM FOR CONFINED LOCATIONS
Published date
12-01-2013
Publisher
Sorry this product is not available in your region.
Describes generic requirements for a DC bulk power plant with remote monitoring capability that, in the Telcordia preliminary view, meets the needs of a typical Telcordia customer for a DC Bulk Power System for Confined Locations (PCOLO).
| DevelopmentNote |
Replaces TR-TSY-000406. (04/2001)
|
| DocumentType |
Standard
|
| PublisherName |
Telcordia Technologies
|
| Status |
Current
|
| Supersedes |
| GR 4228 CORE : ISSUE 2 | VALVE-REGULATED LEAD-ACID (VRLA) BATTERY STRING CERTIFICATION LEVELS BASED ON REQUIREMENTS FOR SAFETY AND PERFORMANCE |
| GR 3150 CORE : ISSUE 3 | GENERIC REQUIREMENTS FOR SECONDARY NON-AQUEOUS LITHIUM BATTERIES |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.