• Shopping Cart
    There are no items in your cart

TR NWT 000295 : ISSUE 2

Current

Current

The latest, up-to-date edition.

ISOLATED GROUND PLANES: DEFINITION AND APPLICATION TO TELEPHONE CENTRAL OFFICES

Published date

12-01-2013

Sorry this product is not available in your region.

Contains Telcordia's view of generic requirements that define grounding methods for metallic frames and electrical power supplies associated with Central Office Stored Program Switching Systems (SPCSS) or other telecommunications systems that are installed as an Isolated Ground Plan. Equipment frame interconnections within the isolated ground plane, the grounding of internal power supplies that power remote loads, the installation of receptacles powered from internal ac power supplies, the sizing of power plant frame grounding conductors, and "girdling" (the encirclement of a grounding conductor by a ring of ferromagnetic material) are also included in the standard.

DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current

GR 454 CORE : ISSUE 1 GENERIC REQUIREMENTS FOR SUPPLIER-PROVIDED DOCUMENTATION
SR 3645 : ISSUE 1 COMPENDIUM OF REQUIREMENTS FOR THE USER INTERFACE TO TELEPHONE NETWORK EQUIPMENT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.