• There are no items in your cart

TR TSY 000016 : ISSUE 1

Current

Current

The latest, up-to-date edition.

BELLCORE-STD-100 AND BELLCORE-STD-200 INSPECTION RESOURCE ALLOCATION PLANS

Published date

12-01-2013

Sorry this product is not available in your region.

Introduction
Executive Overview
2.1 The Sampling Rate
2.2 Fraction of Lots Sampled
2.3 Feedback to the Supplier
BELLCORE-STD-100
3.1 Parameters
3.2 Determining the Parameters
3.2.1 Budget Control Factor (B)
3.3 Calculations
3.4 Example
BELLCORE-STD-200
4.1 Parameters
4.2 Dependence on System Size (N)
4.3 Implementation
4.4 Example
Quality Measurement Plan (QMP) Algorithm
5.1 Acceptance Number (c)
Appendix A: Quality Measurement Plan (QMP)
Appendix B: Sample Budget Factor Calculation
LIST OF ILLUSTRATIONS
Figure 1 Sampling Rate Chart Example for
                        BELLCORE-STD-100
Figure 2 Feedback Model
Figure 3 Sampling Table Example
Figure 4 Acceptance Numbers

Describes Bellcore's view of the sampling plans for attributes and reliability. They utilize the available inspection funds in the most cost effective manner. The three key concepts covered are sampling rate, fraction of lot sampled and feedback to the supplier.

DevelopmentNote
Included in FR 796. (04/2001)
DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current

TR NWT 000284 : ISSUE 2 RELIABILITY AND QUALITY SWITCHING SYSTEMS GENERIC REQUIREMENTS (RQSSGR)
TR NWT 000418 : ISSUE 2 GENERIC RELIABILITY ASSURANCE REQUIREMENTS FOR FIBER OPTIC TRANSPORT SYSTEMS (A MODULE OF RQGR, FR-NWT-000796)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.