TR TSY 000512 : ISSUE 3 SUPP 1
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
LSSGR: RELIABILITY, SECTION 12 (A MODULE OF LSSGR, FR-NWT-000064)
12-01-2013
01-01-1998
Discusses the reliability objectives that apply for the control of system & subsystem failures. The objectives given: cutoff call; ineffective machine attempt; line failure rate; & downtime, covering total system downtime, & individual line & trunk downtime, & simultaneous line & trunk downtime.
| DocumentType |
Standard
|
| PublisherName |
Telcordia Technologies
|
| Status |
Superseded
|
| SupersededBy |
| TR NWT 000284 : ISSUE 2 | RELIABILITY AND QUALITY SWITCHING SYSTEMS GENERIC REQUIREMENTS (RQSSGR) |
| SR TSY 000963 : ISSUE 1 | NETWORK SWITCHING ELEMENT OUTAGE PERFORMANCE MONITORING PROCEDURES |
| TR NWT 001273 : ISSUE 1 REV 1 | |
| TR NWT 000474 : ISSUE 4 | NETWORK MAINTENANCE: ALARM AND CONTROL - NETWORK ELEMENT |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.