UFC 3-220-06 : 2004
Current
The latest, up-to-date edition.
UNIFIED FACILITIES CRITERIA - GROUTING METHODS AND EQUIPMENT
16-09-2016
SECTION 1 - INTRODUCTION
SECTION 2 - SUBSURFACE INVESTIGATIONS
SECTION 3 - GROUTS
SECTION 4 - GROUTING METHODS
SECTION 5 - GROUTING EQUIPMENT
APPENDIX I - REFERENCES
APPENDIX II - SAMPLE GROUTING LOG
APPENDIX III - NOTES FOR THE INSPECTOR
APPENDIX IV - RECORDS AND REPORTS
APPENDIX V - PAYMENT
Gives guidance in the use of pressure grouting as a means to correct existing or anticipated subsurface problems.
DocumentType |
Standard
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Current
|
ASTM C 150/C150M : 2017-04 | SPECIFICATION FOR PORTLAND CEMENT |
MIL STD 619 : B NOTICE 1 | UNIFIED SOIL CLASSIFICATION SYSTEM FOR ROADS, AIRFIELDS, EMBANKMENTS AND FOUNDATIONS |
EM 385-1-1 : 20031103 | SAFETY - SAFETY AND HEALTH REQUIREMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.