• UFC 4-023-10 : 2016

    Current The latest, up-to-date edition.

    UNIFIED FACILITIES CRITERIA - SAFE HAVENS

    Available format(s): 

    Language(s): 

    Published date:  26-09-2016

    Publisher:  US Military Specs/Standards/Handbooks

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    CHAPTER 1 - INTRODUCTION
    CHAPTER 2 - DESIGN CRITERIA DEVELOPMENT
    CHAPTER 3 - DESIGN PROCESS
    CHAPTER 4 - OTHER DESIGN GUIDANCE
    APPENDIX A - REFERENCES
    APPENDIX B - EXAMPLE PROBLEM

    Abstract - (Show below) - (Hide below)

    Gives planning and design requirements and guidance for a safe haven.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher US Military Specs/Standards/Handbooks
    Status Current

    Standards Referencing This Book - (Show below) - (Hide below)

    UFC 4-020-01 : 2008 UNIFIED FACILITIES CRITERIA - DOD SECURITY ENGINEERING FACILITIES PLANNING MANUAL
    UFC 4-010-01 : 2018 UNIFIED FACILITIES CRITERIA - DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
    ASCE/SEI 59 11 : 2011 BLAST PROTECTION OF BUILDINGS
    ICC 500 : 2008 STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS
    NFPA 101 : 2018 LIFE SAFETY CODE
    UFC 4-010-05 : Change 1 UNIFIED FACILITIES CRITERIA - SENSITIVE COMPARTMENTED INFORMATION FACILITIES PLANNING, DESIGN, AND CONSTRUCTION
    UFC 3-340-01 : 2002 UNIFIED FACILITIES CRITERIA - DESIGN AND ANALYSIS OF HARDENED STRUCTURES TO CONVENTIONAL WEAPONS EFFECTS (FOUO)
    UFC 3-310-04 : Change 1 UNIFIED FACILITIES CRITERIA - SEISMIC DESIGN FOR BUILDINGS
    UFC 4-020-03FA : 2006 UNIFIED FACILITIES CRITERIA - SECURITY ENGINEERING: FINAL DESIGN (FOUO)
    UFC 1-200-01 : 20071127 UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE(GENERAL BUILDING REQUIREMENTS)
    ASCE 7 10 : 2010 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
    UFC 4-023-07 : V20080707 UNIFIED FACILITIES CRITERIA - DESIGN TO RESIST DIRECT FIRE WEAPONS EFFECTS
    UFC 4-024-01 : 2008 UNIFIED FACILITIES CRITERIA - SECURITY ENGINEERING: PROCEDURES FOR DESIGNING AIRBORNE CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL PROTECTION FOR BUILDINGS
    UFC 3-301-01 : Change 3 UNIFIED FACILITIES CRITERIA - STRUCTURAL ENGINEERING
    UFC 4-025-01 : 2012 UNIFIED FACILITIES CRITERIA - SECURITY ENGINEERING: WATERFRONT SECURITY
    UFC 3-530-01 : Change 3 UNIFIED FACILITIES CRITERIA - INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective