UFC 4-150-08 : Change 1
Current
The latest, up-to-date edition.
UNIFIED FACILITIES CRITERIA - INSPECTION OF MOORING HARDWARE
28-09-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - PLANNING FACILITY INSPECTION
CHAPTER 3 - QUALIFICATIONS
CHAPTER 4 - INSPECTION FUNDAMENTALS
CHAPTER 5 - REPORT
APPENDIX A - REFERENCES
APPENDIX B - MOORING HARDWARE TESTING
Provides a guide for engineers, planners and facility personnel in scheduling, inspection, maintenance, and repairs of mooring hardware at waterfront facilities and related facilities.
DocumentType |
Standard
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Current
|
UFC 4-159-03 : Change 2 | UNIFIED FACILITIES CRITERIA - DESIGN: MOORINGS |
UFC 4-151-10 : Change 1 | UNIFIED FACILITIES CRITERIA - GENERAL CRITERIA FOR WATERFRONT CONSTRUCTION |
UFC 4-150-07 : Change 1 | UNIFIED FACILITIES CRITERIA - MAINTENANCE AND OPERATION: MAINTENANCE OF WATERFRONT FACILITIES |
UFC 4-152-01 : 2017 | UNIFIED FACILITIES CRITERIA - DESIGN: PIERS AND WHARVES |
MIL HDBK 1025/1 : 0 | |
UFC 4-150-07 : Change 1 | UNIFIED FACILITIES CRITERIA - MAINTENANCE AND OPERATION: MAINTENANCE OF WATERFRONT FACILITIES |
ASTM E 488 : 1996 | Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.