UNE-EN 12063:2024
Current
The latest, up-to-date edition.
Execution of special geotechnical work - Sheet pile walls, combined pile walls, high modulus walls
Hardcopy , PDF
Spanish, Castilian, English
30-10-2024
This document specifies requirements, recommendations and information concerning the execution of permanent or temporary sheet pile wall, combined pile walls, high modulus walls structures and the handling of equipment and materials.It does not give requirements and recommendations for the installation of specific parts of the structure such as ground anchorages and piles which are covered by other documents.It applies only to steel sheet pile walls, combined walls, high modulus walls, synthetic sheet pile walls (composite), precast concrete and timber sheet pile walls. Tubular piles included in combined walls and high modulus walls can be filled with concrete.Composite structures such as Berliner walls and sheet pile walls in combination with shotcrete, are not covered by this document.
| Committee |
CTN 103/SC 3
|
| DocumentType |
Standard
|
| Pages |
141
|
| PublisherName |
Asociación Española de Normalización
|
| Status |
Current
|
| Standards | Relationship |
| EN 12063:2024 | Identical |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.