UNI CEI EN 50518-2 : 2014
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
22-07-2022
01-01-2014
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
7 Testing
8 Data
9 Data storage
10 Availability and verification of performance of
the ARC
11 Contingency plan
Annex A (normative) - ARC availability calculations
Bibliography
Defines the technical requirements of an ARC and also includes functional performance criteria and verification of performance.
Committee |
U63.00
|
DevelopmentNote |
Together with UNI CEI EN 50518-1 and UNI CEI EN 50518-3, it supersedes UNI 11068. (04/2014)
|
DocumentType |
Standard
|
PublisherName |
Ente Nazionale Italiano di Unificazione (UNI)
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
CEI UNI EN 50518-2 : 2015 | Identical |
EN 50518-2:2013 | Identical |
EN 50518-1:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS |
EN 50136-1:2012 | Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems |
EN 50518-3:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
CLC/TS 50136-4:2004 | Alarm systems - Alarm transmission systems and equipment - Part 4: Annunciation equipment used in alarm receiving centres |
EN 50131-1:2006/A2:2017 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.