UNI EN 1474 : 1999
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF LOADING/UNLOADING ARMS
04-10-2022
UNI EN 1474-3 : 2009
UNI EN 1474-1 : 2009
UNI EN 1474-2 : 2009
01-01-1999
1 Scope
2 Normative references
3 Definitions and abbreviations
4 Design of the arms
5 Safety precautions
6 Connection with the ship
7 Operating and control design
8 Inspection and tests
Annexes
A (informative) Ship movements
B (normative) Operating envelope
C (normative) Alarm areas
D (normative) Materials
E (normative) Constant position monitoring system
F (informative) Clearance checks
G (informative) Bibliography
Defines the design, selection of material, minimum safety requirements and inspection and testing methods for liquefied natural gas loading and unloading arms. In addition, it describes the minimum requirements for safe LNG ship-to-shore transfer.
DocumentType |
Standard
|
PublisherName |
Ente Nazionale Italiano di Unificazione (UNI)
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
SN EN 1474 : 1998 | Identical |
NF EN 1474 : 1997 | Identical |
EN 1474 : 1997 | Identical |
I.S. EN 1474:1998 | Identical |
DIN EN 1474:1997-11 | Identical |
NEN EN 1474 : 1997 | Identical |
NBN EN 1474 : 1997 | Identical |
UNE-EN 1474:1999 | Identical |
NS EN 1474 : 1ED 1997 | Identical |
BS EN 1474:1997 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.