UNI EN 303-3 : 2007
Current
The latest, up-to-date edition.
HEATING BOILERS - PART 3: GAS-FIRED HEATING BOILERS - ASSEMBLY COMPRISING A BOILER BODY AND A FORCED DRAUGHT BURNER
19-04-2007
Foreword
1 Scope
2 Normative references
3 Definitions
4 Assembly requirements
5 Operational requirements
6 Test methods
7 Instructions
Annex A (informative) Diameters of combustion products
evacuation ducts marketed in the
various countries
Annex B (informative) Practical method of calibrating the
test rig to enable determination of
heat loss D[p]
Annex C (informative) Determination of the heat losses from
the test rig of the indirect method
and the contributions of the circulating
pump of the test rig
Annex D (informative) Determination of the ignition time at
full rate
Annex E (normative) Assembly criteria
Annex F (informative) Ranges of boilers
Annex G (normative) Case of a boiler body which has already
been tested with a liquid fuel burner in
accordance with EN 303-1, EN 303-2 and EN 304
Annex ZA (informative) Clauses of this European Standard
addressing essential requirements or
other provisions of EU Directives
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.