Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Planning and exchange of information
5 Competency
6 Design
7 Gas transporter appraisal of primary meter
installations
8 Location and housing of MP meter installations
9 Fitting a meter installation
10 Testing, purging and commissioning of the regulator
assembly
11 Fitting, testing and purging the meter
12 Commissioning of the meter installation
13 Notices and labels
14 Records
15 Meter exchange and/or replacement of other components
16 Post installation checks
Annex A (normative) Sizing of meters
Annex B (normative) Operational pressure limits
Annex C (normative) Testing, purging and commissioning
of the regulator assembly