16/30344309 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
BS ISO 17800 - FACILITY SMART GRID INFORMATION MODEL
Hardcopy , PDF
25-01-2018
English
1. Purpose
2. Scope
3. Definitions
4. FSGIM Structure and Usage
5. Device and Model Components
6. Common Primitive Types, Classes, and Enumerations
7. Conformance Requirements
8. References
9. Annex A (Normative) - UML Model
BS ISO 17800.
Committee |
RHE/2
|
DocumentType |
Draft
|
Pages |
836
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC TR 61850-90-7:2013 | Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.