CEI EN 61400-25-1 : 2007
|
WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
PD IEC/TS 61850-80-1:2016
|
Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
16/30340907 DC : 0
|
BS EN 61400-25-6 ED 2.0 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
05/30137809 DC : DRAFT AUG 2005
|
IEC 61400-25-4 ED 1 - WIND TURBINES - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO XML BASED COMMUNICATION PROFILE |
PD IEC/TS 61850-80-4:2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-4: TRANSLATION FROM THE COSEM OBJECT MODEL (IEC 62056) TO THE IEC 61850 DATA MODEL |
12/30274900 DC : 0
|
BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
PD IEC/TR 61850-80-3:2015
|
Communication networks and systems for power utility automation Mapping to web protocols. Requirements and technical choices |
07/30168422 DC : 0
|
BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
CEI EN 61850-7-420 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
16/30344488 DC : 0
|
BS EN 61850-7-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
PD IEC/TR 61850-7-500:2017
|
Communication networks and systems for power utility automation Basic information and communication structure. Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
IEC 61970-301 REDLINE : 6ED 2016
|
ENERGY MANAGEMENT SYSTEM APPLICATION PROGRAM INTERFACE (EMS-API) - PART 301: COMMON INFORMATION MODEL (CIM) BASE |
CEI EN 61400-25-6 : 2011
|
WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
CEI EN 61850-9-2 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
EN 61400-25-5:2017
|
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
BS EN 61850-7-420:2009
|
Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes |
BS EN 61850-6:2010
|
Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
CEI EN 61850-7-2 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
PREN 50491-12 : DRAFT 2014
|
GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 12: SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER |
I.S. EN 61400-25-6:2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
CEI EN 61850-8-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV)) |
CEI CLC/TS 61850-80-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
IEC 61970-301:2016
|
Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
IEC 61850-6:2009
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC TR 61850-1:2013
|
Communication networks and systems for power utility automation - Part 1: Introduction and overview |
NF EN 61850-6 : 2004
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
IEC 61400-25-4:2016 RLV
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61400-25-4:2017
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61850-10:2013
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-3:2015 RLV
|
Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
EN 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61400-25-6:2017
|
Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61970-301:2016 RLV
|
Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
EN 61850-7-420:2009
|
Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-6:2010
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
EN 61850-9-1:2003
|
Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link |
03/110578 DC : DRAFT AUG 2003
|
IEC 61400-25 ED.1.0 - WIND TURBINES - PART 25: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS |
09/30145360 DC : 0
|
BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3 |
05/30137801 DC : DRAFT AUG 2005
|
IEC 61400-25-2 ED 1 - WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
02/206919 DC : DRAFT MAY 2002
|
IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3 |
I.S. EN 61400-25-2:2015
|
WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
CEI EN 61850-5 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS |
CEI EN 61850-10 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
16/30344309 DC : 0
|
BS ISO 17800 - FACILITY SMART GRID INFORMATION MODEL |
16/30346107 DC : 0
|
BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
17/30358470 DC : 0
|
BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
I.S. EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
DD CLC/TS 61850-80-1:2010
|
Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
BS EN 61400-25-2:2015
|
Wind turbines Communications for monitoring and control of wind power plants - Information models |
09/30212527 DC : 0
|
BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
BS EN 61850-9-2:2011
|
Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3 |
12/30260040 DC : 0
|
BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
04/30092543 DC : DRAFT MAR 2004
|
|
ASHRAE/NEMA 201 : 2016 ERRATA 2018
|
FACILITY SMART GRID INFORMATION MODEL |
IEC TS 62351-2:2008
|
Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms |
IEC TR 61850-90-5:2012
|
Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEEE C37.119-2005
|
GUIDE FOR BREAKER FAILURE PROTECTION OF POWER CIRCUIT BREAKERS |
PREN 50491-12-1 : DRAFT 2017
|
GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER - PART 12-1: INTERFACE BETWEEN THE CEM AND HOME/BUILDING RESOURCE MANAGER - GENERAL REQUIREMENTS AND ARCHITECTURE |
IEC TR 61850-90-7:2013
|
Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems |
I.S. EN 62689-1:2016
|
CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
IEC TS 61850-80-4:2016
|
Communication networks and systems for power utility automation - Part 80-4: Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model |
IEC 61400-25-3 REDLINE : 2ED 2015
|
WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS |
IEC 62689-1:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements |
BS EN 62271-3:2015
|
High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
PD IEC/TR 61850-7-510:2012
|
Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines |
14/30284930 DC : 0
|
BS EN 62689-2 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: GENERAL PRINCIPLES AND REQUIREMENTS |
BS EN 61850-7-4:2010 (published 2010-07)
|
Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
DD IEC/TS 62351-7:2010
|
Power systems management and associated information exchange. Data and communication security Network and system management (NSM) data object models |
BS EN 61400-25-4:2008
|
Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile |
PD IEC/TR 61850-1:2013 (published 2013-03)
|
Communication networks and systems for power utility automation Introduction and overview |
DD IEC TS 61850-80-1 : DRAFT JAN 2009
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
12/30267268 DC : 0
|
BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
CLC/TS 61850-80-1:2010
|
Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
03/304152 DC : DRAFT MAR 2003
|
IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
CEI EN 61400-25-4 : 2009
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
17/30362273 DC : DRAFT SEP 2017
|
BS EN 50491-12-1 - GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER - PART 12-1: INTERFACE BETWEEN THE CEM AND HOME/BUILDING RESOURCE MANAGER - GENERAL REQUIREMENTS AND ARCHITECTURE |
PD IEC/TR 61850-90-4:2013
|
Communication networks and systems for power utility automation Network engineering guidelines |
02/206918 DC : DRAFT MAY 2002
|
IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE |
DD IEC/TS 61850-2:2003
|
Communication networks and systems in substations Glossary |
07/30147754 DC : 0
|
BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
12/30265386 DC : 0
|
BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
I.S. EN 62361-2:2013
|
POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) |
11/30251804 DC : 0
|
BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
BS EN 61970-301:2017
|
Energy management system application program interface (EMS-API) Common information model (CIM) base |
BS EN 61850-7-2:2010
|
Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
16/30336107 DC : 0
|
BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
BS EN 61850-7-1:2011
|
Communication networks and systems for power utility automation Basic communication structure. Principles and models |
BS EN 62689-2:2017
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes System aspects |
15/30326344 DC : 0
|
BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
CEI EN 61850-9-1 : 2015
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SYSTEM MAPPINGS (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
BS EN 61850-5:2013
|
Communication networks and systems for power utility automation Communication requirements for functions and device models |
EN 62689-2:2017
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects |
IEC TR 61850-7-510:2012
|
Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
ISO 17800:2017
|
Facility smart grid information model |
CEI EN 61400-25-5 : 2007
|
WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61850-6:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-7-4:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
I.S. EN 61850-7-420:2009
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
IEC 62689-2:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects |
CEI EN 61850-7-4 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
IEC 61869-9:2016
|
Instrument transformers - Part 9: Digital interface for instrument transformers |
IEC 62270:2013
|
Guide for computer-based control for hydroelectric power plant automation |
I.S. EN 61970-301:2017
|
ENERGY MANAGEMENT SYSTEM APPLICATION PROGRAM INTERFACE (EMS-API) - PART 301: COMMON INFORMATION MODEL (CIM) BASE |
NF EN 61850-7-2 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
IEC 62361-2:2013
|
Power systems management and associated information exchange - Interoperability in the long term - Part 2: End to end quality codes for supervisory control and data acquisition (SCADA) |
EN 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-9-2:2011
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
PD IEC/TR 61850-90-7:2013
|
Communication networks and systems for power utility automation Object models for power converters in distributed energy resources (DER) systems |
BS EN 62361-2:2013
|
POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) |
BS EN 61850-9-1:2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
17/30358185 DC : 0
|
BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
OVE/ONORM EN 61400-25-1 : 2007
|
WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
EN 62689-1:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements |
PD IEC/TR 61850-90-2:2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-2: USING IEC 61850 FOR COMMUNICATION BETWEEN SUBSTATIONS AND CONTROL CENTRES |
CEI EN 61850-7-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
05/30137797 DC : DRAFT AUG 2005
|
IEC 61400-25-1 ED 1 - WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
08/30182501 DC : DRAFT MAY 2008
|
BS EN 61850-7-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
14/30301438 DC : 0
|
BS EN 62746-3 ED 1.0 - SYSTEMS INTERFACE BETWEEN CUSTOMER ENERGY MANAGEMENT SYSTEM AND THE POWER MANAGEMENT SYSTEM - PART 3: ARCHITECTURE |
07/30166755 DC : 0
|
BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
BS EN 62689-1:2016 (published 2017-01)
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements |
PD IEC/TR 61850-90-5:2012
|
Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
BS EN 61400-25-6:2017
|
Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring |
BS EN 61850-10:2013
|
Communication networks and systems for power utility automation Conformance testing |
DD IEC/TS 62351-2:2008
|
Power systems management and associated information exchange. Data and communications security Glossary of terms |
IEC TR 61850-7-500:2017
|
Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
I.S. EN 61850-9-1:2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
IEC TR 61850-90-10:2017
|
Communication networks and systems for power utility automation - Part 90-10: Models for scheduling |
CEI EN 62361-2 : 2014
|
POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END-TO-END QUALITY CODES FOR SCADA |
I.S. EN 62689-2:2017
|
CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: SYSTEM ASPECTS |
BS EN 61850-7-410 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
I.S. EN 61850-7-2:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
I.S. EN 61400-25-5:2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
NF EN 61400-25-4 : 2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
IEC TS 62351-7:2010
|
Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models |
I.S. EN 61400-25-3:2015
|
WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS |
NF EN 61850-7-4 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
IEC TS 61850-80-1:2016
|
Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
I.S. EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
I.S. EN 61850-8-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC TR 62351-90-1:2018
|
Power systems management and associated information exchange - Data and communications security - Part 90-1: Guidelines for handling role-based access control in power systems |
IEC TR 61850-80-3:2015
|
Communication networks and systems for power utility automation - Part 80-3: Mapping to web protocols - Requirements and technical choices |
IEC 61850-9-2:2011
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
I.S. EN 61850-9-2:2011&A1:2020
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)
|
IEC 61850-7-2:2010
|
Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61400-25-4:2016
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-2:2015
|
Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61850-7-1:2011
|
Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
IEC 61850-7-410:2012+AMD1:2015 CSV
|
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEC 61850-9-1:2003
|
Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link |
EN 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61400-25-3:2015
|
Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61850-7-420:2009
|
Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-7-2:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61400-25-3:2015
|
Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
07/30166751 DC : 0
|
BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
06/30145429 DC : DRAFT MAY 2006
|
|
S.R. CLC/TS 61850-80-1:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED ATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
I.S. EN 61850-7-410:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
12/30268049 DC : 0
|
BS EN 62689-1 - CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
05/30137813 DC : DRAFT AUG 2005
|
IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
15/30325214 DC : 0
|
BS EN 61400-25-4 ED 2.0 - WIND TURBINES - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
14/30314488 DC : 0
|
BS EN 50491-12 - GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 12: SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER |
BS EN 61400-25-3:2015
|
WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS |
PD IEC/TR 61850-90-10:2017
|
Communication networks and systems for power utility automation Models for scheduling |
IEC TS 61850-2:2003
|
Communication networks and systems in substations - Part 2: Glossary |
14/30300261 DC : 0
|
BS EN 62689-1 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: SYSTEM ASPECTS |
BS EN 61850-8-1:2011
|
Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEEE 1815.1-2015
|
EXCHANGING INFORMATION BETWEEN NETWORKS IMPLEMENTING IEC 61850 AND IEEE STD 1815 [TM] [DISTRIBUTED NETWORK PROTOCOL (DNP3)] |
I.S. EN 61400-25-4:2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
IEC 61400-25-4 REDLINE : 2ED 2016
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
CEI EN 61850-6 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
BS EN 61400-25-5:2017
|
Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
NF EN 61400-25-2 : 2016
|
WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
IEEE 1249 : 2013
|
GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
IEEE 2030.100:2017
|
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control |
NF EN 61850-7-410 : 2013 AMD 1 2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
IEC TR 61850-90-2:2016
|
Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 61400-25-5:2017
|
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
I.S. EN 61850-5:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV)) |
I.S. EN 61850-10:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 61850-7-410:2013/A1:2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015) |
IEC 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN 61970-301:2017
|
Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
IEC 61850-10:2012
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-6:2016
|
Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61850-5:2013
|
Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
EN 62361-2 : 2013
|
POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) (IEC 62361-2:2013) |
EN 61400-25-2:2015
|
Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
EN 61850-5:2013
|
Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |