17/30350234 DC : DRAFT AUG 2017
Current
The latest, up-to-date edition.
BS EN 50641 - RAILWAY APPLICATIONS - FIXED INSTALLATIONS - REQUIREMENTS FOR THE VALIDATION OF SIMULATION TOOLS USED FOR THE DESIGN OF TRACTION POWER SUPPLY SYSTEMS
21-09-2017
European foreword
1 Scope
2 Normative references
3 Definition
4 Symbols and abbreviated terms
5 General
6 Test and models description
7 Plausibility of expected outputs
8 Verification of expected output
9 Validation with simulated values
10 Assessment
Annex A (normative) - Nominal infrastructure,
Train output results - validation boundary value
Annex B (normative) - Nominal Infrastructure,
Substation output results - validation boundary values
Annex C (normative) - Substation outage,
Train output results - validation boundary value
Annex D (normative) - Substation outage, Substation
output results - validation boundary values
Annex E (normative) - Individual graphs for each
system and operating condition infrastructure
Annex ZZ (informative) - Relationship between this
European Standard and the Essential
Requirements of EU Directive 2008/57/EC
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.