API 2INT-DG : 2007
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
INTERIM GUIDANCE FOR DESIGN OF OFFSHORE STRUCTURES FOR HURRICANE CONDITIONS
Hardcopy , PDF
04-09-2024
English
01-05-2007
1 SCOPE
2 GENERAL GUIDANCE FOR NEW STRUCTURES
3 API RP 2A-WSD - INTERIM GUIDANCE FOR FIXED PLATFORMS
4 API BULL 2TD - INTERIM GUIDANCE FOR TIE-DOWNS
5 API RP 2T - INTERIM GUIDANCE FOR TENSION LEG PLATFORMS
6 API RP 2FPS - INTERIM GUIDANCE FLOATING PRODUCTION SYSTEMS
7 API RP 2SK - INTERIM GUIDANCE FOR STATION KEEPING
8 API RP 2RD - INTERIM GUIDANCE FOR DYNAMIC RISERS
9 COMMENTARY
Gives guidance on the use of updated hurricane winds, waves, surge and current conditions in API Bulletin 2INT-MET in the design of offshore structures in the Gulf of Mexico, particularly in the central region and its adjoining transitions.
DevelopmentNote |
To be read in conjunction with API 2A WSD, API 2TD, API 2T, API 2FPS, API 2SK & API 2RD. (12/2009)
|
DocumentType |
Standard
|
Pages |
22
|
ProductNote |
This product is unavailable in Cuba, Iran, North Korea, Syria
|
PublisherName |
American Petroleum Institute
|
Status |
Superseded
|
SupersededBy |
API 2SIM : 2014 | STRUCTURAL INTEGRITY MANAGEMENT OF FIXED OFFSHORE STRUCTURES |
API 96 : 2013 | DEEPWATER WELL DESIGN AND CONSTRUCTION |
API 2A WSD : 2014 | PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN |
API 2RD : 2013 | DYNAMIC RISERS FOR FLOATING PRODUCTION SYSTEMS |
API 2FPS : 2011 | PLANNING, DESIGNING, AND CONSTRUCTING FLOATING PRODUCTION SYSTEMS |
API 2TD : 2006 | GUIDELINES FOR TIE-DOWNS ON OFFSHORE PRODUCTION FACILITIES FOR HURRICANE SEASON |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.