• API 65 : 2002

    Current The latest, up-to-date edition.

    CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS

    Available format(s): 

    Language(s): 

    Published date:  01-01-2012

    Publisher:  American Petroleum Institute

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 SCOPE
       1.1 Flows
       1.2 Hazards
       1.3 Best Practices
    2 REFERENCES
    3 TERMS AND DEFINITIONS
    4 SITE SELECTION
    5 DRILLING
    6 FLOW CONTROL AND SEVERITY
       6.1 Flow Control
       6.2 Flow Severity
    7 FLUID PROPERTIES
       7.1 General
       7.2 Sacrificial or Cut Mud
       7.3 Pad Mud (Fluid left in hole prior to cementing)
       7.4 Settable Fluids
       7.5 Rat Hole Fluid
    8 WELLBORE PREPARATION AND CONDITIONING
       8.1 General
       8.2 Well Preparation
       8.3 Lost Circulation
    9 OPERATIONAL PROCEDURES AND GOOD CEMENTING PRACTICES
       9.1 General
       9.2 Casing Hardware/Equipment
       9.3 Pipe Movement
    10 MUD REMOVAL AND PLACEMENT TECHNIQUE
       10.1 General
       10.2 Displacement Optimization
       10.3 Spacers/Flushes/Sweeps
       10.4 Pumping Schedules/Simulations
    11 CEMENT SLURRY DESIGN
       11.1 General
       11.2 Base Cement Compositions
       11.3 Cement Formulation and Properties
       11.4 Cement Density
       11.5 Cement Volumes
       11.6 Laboratory testing and results
       11.7 Temperature Determination
    12 PRE-JOB PREPARATIONS
    13 HEALTH, SAFETY AND ENVIRONMENT
    14 CEMENT JOB EXECUTION
       14.1 Cement mixing and displacement parameters
       14.2 Data Acquisition
       14.3 On-Site Fluids Testing
    15 ADDITIONAL CONSIDERATIONS AND PROCEDURES
       15.1 Cementing with a Riser Installed
       15.2 Contingency Planning
    16 POST CEMENTING OPERATIONS
       16.1 Post-Job Analysis
       16.2 Annular Sealing
       16.3 Clean-out/removal of excess cement
       16.4 Waiting-on-Cement (WOC) Time
       16.5 Pressure Testing Casing Shoes/Formation
    17 REMEDIATION OF FLOWS
    18 BIBLIOGRAPHY
    APPENDIX A - SHALLOW WATER FLOW INTERPRETATION GUIDE
    APPENDIX B - DRILLING PRACTICES TO REDUCE RISK OF SHALLOW
                 WATER FLOWS
    APPENDIX C - PROCESS FOR SUCCESSFULLY CEMENTING CASING
                 HAVING SHALLOW WATER FLOW POTENTIAL
    APPENDIX D - FOAMED CEMENT INFORMATION
    APPENDIX E - PRE-JOB PREPARATIONS
    APPENDIX F - CEMENTING MATRIX
    APPENDIX G - MECHANICAL ISOLATION

    Abstract - (Show below) - (Hide below)

    Provides the compilation of technology and practices used by many operators drilling wells in deep water.

    General Product Information - (Show below) - (Hide below)

    Development Note Also available in RUSSIAN version, see API 65 RUSSIAN. (03/2012) Also available in Kazakh version, see API 65 KAZAKH. (09/2014)
    Document Type Standard
    Product Note NEW CHILD ERR 1 2003 IS NOW ADDED
    Publisher American Petroleum Institute
    Status Current

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS ISO 27914:2017 Carbon dioxide capture, transportation and geological storage. Geological storage
    16/30292328 DC : 0 BS ISO 27914 - CARBON DIOXIDE CAPTURE, TRANSPORTATION AND GEOLOGICAL STORAGE - GEOLOGICAL STORAGE
    11/30248021 DC : 0 AEROSPACE SERIES - COPPER ALLOY CUBE 1.9 - SOLUTION TREATED, COLD WORKED TO [1/2] HARD AND PRECIPITATION TREATED - BAR - 5 MM <= A OR D <= 190 MM - R[M] >= 1220 MPA
    API STD 65-PART 2:2010(R2016) ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION
    API 90:2006 ANNULAR CASING PRESSURE MANAGEMENT FOR OFFSHORE WELLS
    18/30367635 DC : 0 BS EN ISO 10426-3 - PETROLEUM AND NATURAL GAS INDUSTRIES - CEMENTS AND MATERIALS FOR WELL CEMENTING - PART 3: TESTING OF DEEPWATER WELL CEMENT FORMULATIONS
    ISO 27914:2017 Carbon dioxide capture, transportation and geological storage Geological storage
    API 96 : 2013 DEEPWATER WELL DESIGN AND CONSTRUCTION
    API 97 : 2013 WELL CONSTRUCTION INTERFACE DOCUMENT GUIDELINES
    API 10B-4:2004 PREPARATION AND TESTING OF FOAMED CEMENT FORMULATIONS AT ATMOSPHERIC PRESSURE
    API 65-2:2010 ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION
    API 90 : 2006 : R2012 ANNULAR CASING PRESSURE MANAGEMENT FOR OFFSHORE WELLS
    API 10B-4 : 2004 : R2015 PREPARATION AND TESTING OF FOAMED CEMENT FORMULATIONS AT ATMOSPHERIC PRESSURE
    API 10B-4 : 2004 : R2010 PREPARATION AND TESTING OF FOAMED CEMENT FORMULATIONS AT ATMOSPHERIC PRESSURE

    Standards Referencing This Book - (Show below) - (Hide below)

    ISO 10426-3:2003 Petroleum and natural gas industries Cements and materials for well cementing Part 3: Testing of deepwater well cement formulations
    ISO 10426-2:2003 Petroleum and natural gas industries — Cements and materials for well cementing — Part 2: Testing of well cements
    API 10B : 1997 TESTING WELL CEMENTS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective