• API STD 65-PART 2:2010(R2016)

    Current The latest, up-to-date edition.

    ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION

    Available format(s): 

    Language(s): 

    Published date:  26-11-2016

    Publisher:  American Petroleum Institute

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 Scope
    2 Normative References
    3 Definitions, and Abbreviated Terms
    4 Barriers
    5 Cementing Practices and Factors Affecting Cementing
      Success
    6 Casing Shoe Testing
    7 Post-cement Job Analysis and Evaluation
    Annex A (informative) - Background and Technology
    Annex B (informative) - Well Planning and Drilling Plan
            Considerations
    Annex C (informative) - Drilling the Well
    Annex D (normative) - Process Summary: Isolating Potential
            Flow Zones During Well Construction
    Bibliography

    Abstract - (Show below) - (Hide below)

    Provides practices for isolating potential flow zones, an integral element in maintaining well integrity.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Product Note Reconfirmed 2016 This product is unavailable in Cuba, Iran, North Korea, Syria
    Publisher American Petroleum Institute
    Status Current
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    API 10B-2 : 2013 RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS
    ISO 10426-3:2003 Petroleum and natural gas industries Cements and materials for well cementing Part 3: Testing of deepwater well cement formulations
    API 10B-3 : 2016 TESTING OF WELL CEMENTS USED IN DEEPWATER WELL CONSTRUCTION
    API TR 10TR1 : 2008 CEMENT SHEATH EVALUATION
    ISO 10427-2:2004 Petroleum and natural gas industries Equipment for well cementing Part 2: Centralizer placement and stop-collar testing
    ISO 10426-5:2004 Petroleum and natural gas industries — Cements and materials for well cementing — Part 5: Determination of shrinkage and expansion of well cement formulations at atmospheric pressure
    API TR 10TR3:1999 TECHNICAL REPORT ON TEMPERATURES FOR API CEMENT OPERATING THICKENING TIME TESTS
    API 10TR5 : 2008 METHODS FOR TESTING OF SOLID AND RIGID CENTRALIZERS
    ISO 10427-1:2001 Petroleum and natural gas industries — Equipment for well cementing — Part 1: Casing bow-spring centralizers
    ISO 10414-2:2011 Petroleum and natural gas industries Field testing of drilling fluids Part 2: Oil-based fluids
    ISO 10426-2:2003 Petroleum and natural gas industries — Cements and materials for well cementing — Part 2: Testing of well cements
    ISO 10426-4:2004 Petroleum and natural gas industries Cements and materials for well cementing Part 4: Preparation and testing of foamed cement slurries at atmospheric pressure
    API 65 : 2002 CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS
    ISO 10427-3:2003 Petroleum and natural gas industries — Equipment for well cementing — Part 3: Performance testing of cementing float equipment
    API WORLDWIDE CEMENTING PRACTICES : 1ED 91(R1995) WORLDWIDE CEMENTING PRACTICES
    API RP 13B-2 : 2014 RECOMMENDED PRACTICE FOR FIELD TESTING OF OIL-BASED DRILLING FLUIDS
    ISO 10426-6:2008 Petroleum and natural gas industries — Cements and materials for well cementing — Part 6: Methods for determining the static gel strength of cement formulations
    API 10TR4 : 2008 SELECTION OF CENTRALIZERS FOR PRIMARY CEMENTING OPERATIONS
    API 53 : 2012 BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS
    ISO 10414-1:2008 Petroleum and natural gas industries — Field testing of drilling fluids — Part 1: Water-based fluids
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective