API HF1 : 2009
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
HYDRAULIC FRACTURING OPERATIONS - WELL CONSTRUCTION AND INTEGRITY GUIDELINES
13-03-2024
01-10-2009
1 Scope
2 Normative References
3 General Principles
3.1 Protecting Groundwater and the Environment
3.2 Well Design and Construction
3.3 The Drilling and Completion Process
4 Casing Guidance
5 Cementing the Casing
5.1 General
5.2 Cement Selection
5.3 Zone Isolation
5.4 Cementing Practices
5.5 Casing Centralizers
6 Well Logging and Other Testing
6.1 General
6.2 Open-hole Well Logging
6.3 Cement Integrity (Cased-hole) Logging
6.4 Other Testing and Information
7 Well Construction Guidelines
7.1 General
7.2 Conductor Casing
7.3 Surface Casing
7.4 Intermediate Casing
7.5 Production Casing
7.6 Horizontal Wells
8 Perforating
9 Hydraulic Fracturing
9.1 General
9.2 Horizontal Fractures
9.3 Vertical Fractures
9.4 Hydraulic Fracturing Process
9.5 Hydraulic Fracturing Equipment and Materials
10 Data Collection, Analysis, and Monitoring
10.1 General
10.2 Baseline Assessment
10.3 "Mini frac" Treatment and Analysis
10.4 Monitoring During Hydraulic Fracturing Operations
10.5 Post-hydraulic Fracturing Monitoring Techniques
10.6 Post-completion Monitoring
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.