API RP 1170 : 2015
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
DESIGN AND OPERATION OF SOLUTION-MINED SALT CAVERNS USED FOR NATURAL GAS STORAGE
Hardcopy , PDF
01-12-2022
English
01-07-2015
1 Scope
2 Normative References
3 Terms, Definitions, Acronyms, and Abbreviations
4 Overview of Underground Natural Gas Storage
5 Geological and Geomechanical Evaluation
6 Well Design
7 Drilling
8 Cavern Solution Mining
9 Gas Storage Operations
10 Cavern Integrity Monitoring
11 Cavern Abandonment
Annex A (informative) - Open-hole Well Logs
Annex B (normative) - Integrity Monitoring Methods
Bibliography
Gives the functional recommendations for salt cavern facilities used for natural gas storage service and covers facility geomechanical assessments, cavern well design and drilling, solution mining techniques and operations, including monitoring and maintenance practices.
DocumentType |
Standard
|
Pages |
96
|
ProductNote |
This product is unavailable in Cuba, Iran, North Korea, Syria
|
PublisherName |
American Petroleum Institute
|
Status |
Superseded
|
SupersededBy |
API RP 1171 : 2015 | FUNCTIONAL INTEGRITY OF NATURAL GAS STORAGE IN DEPLETED HYDROCARBON RESERVOIRS AND AQUIFER RESERVOIRS |
API STD 1104:2013 | WELDING OF PIPELINES AND RELATED FACILITIES |
API RP 13D : 2017 | RHEOLOGY AND HYDRAULICS OF OIL-WELL DRILLING FLUIDS |
API 5CT : 2012 | CASING AND TUBING |
API 6A : 2010 | SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT |
ASTM D 3740 : 2012-06 | PRACTICE FOR MINIMUM REQUIREMENTS FOR AGENCIES ENGAGED IN TESTING AND/OR INSPECTION OF SOIL AND ROCK AS USED IN ENGINEERING DESIGN AND CONSTRUCTION |
API 5A2 : 6ED 88 | BULLETIN ON THREAD COMPOUNDS FOR CASING, TUBING AND LINE PIPE |
API TR 10TR3:1999 | TECHNICAL REPORT ON TEMPERATURES FOR API CEMENT OPERATING THICKENING TIME TESTS |
API 5DP : 2010(R2015) | SPECIFICATION FOR DRILL PIPE |
API 5L : 2012 | LINE PIPE |
API 10A : 2011 | SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING |
API RP 1114 : 2013 | RECOMMENDED PRACTICE FOR THE DESIGN OF SOLUTION-MINED UNDERGROUND STORAGE FACILITIES |
API 5A3 : 2011 | RECOMMENDED PRACTICE ON THREAD COMPOUNDS FOR CASING, TUBING, LINE PIPE, AND DRILL STEM ELEMENTS |
API 6D :2015 | SPECIFICATION FOR PIPELINE AND PIPING VALVES |
API 5C3 : 1994 | BULLETIN ON FORMULAS AND CALCULATIONS FOR CASING, TUBING, DRILL PIPE AND LINE PIPE PROPERTIES |
ASTM D 7070 : 2016 : REDLINE | Standard Test Methods for Creep of Rock Core Under Constant Stress and Temperature |
API 10TR4 : 2008 | SELECTION OF CENTRALIZERS FOR PRIMARY CEMENTING OPERATIONS |
ASTM D 3967 : 2016 : REDLINE | Standard Test Method for Splitting Tensile Strength of Intact Rock Core Specimens |
API 53 : 2012 | BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.