API STD 65-PART 2:2010(R2016)
Current
The latest, up-to-date edition.
ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION
Hardcopy , PDF
English
26-11-2016
1 Scope
2 Normative References
3 Definitions, and Abbreviated Terms
4 Barriers
5 Cementing Practices and Factors Affecting Cementing
Success
6 Casing Shoe Testing
7 Post-cement Job Analysis and Evaluation
Annex A (informative) - Background and Technology
Annex B (informative) - Well Planning and Drilling Plan
Considerations
Annex C (informative) - Drilling the Well
Annex D (normative) - Process Summary: Isolating Potential
Flow Zones During Well Construction
Bibliography
Provides practices for isolating potential flow zones, an integral element in maintaining well integrity.
DocumentType |
Standard
|
Pages |
96
|
ProductNote |
Reconfirmed 2016 This product is unavailable in Cuba, Iran, North Korea, Syria
|
PublisherName |
American Petroleum Institute
|
Status |
Current
|
Supersedes |
API 10B-2 : 2013 | RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS |
ISO 10426-3:2003 | Petroleum and natural gas industries Cements and materials for well cementing Part 3: Testing of deepwater well cement formulations |
API 10B-3 : 2016 | TESTING OF WELL CEMENTS USED IN DEEPWATER WELL CONSTRUCTION |
API TR 10TR1 : 2008 | CEMENT SHEATH EVALUATION |
ISO 10427-2:2004 | Petroleum and natural gas industries — Equipment for well cementing — Part 2: Centralizer placement and stop-collar testing |
ISO 10426-5:2004 | Petroleum and natural gas industries — Cements and materials for well cementing — Part 5: Determination of shrinkage and expansion of well cement formulations at atmospheric pressure |
API TR 10TR3:1999 | TECHNICAL REPORT ON TEMPERATURES FOR API CEMENT OPERATING THICKENING TIME TESTS |
API 10TR5 : 2008 | METHODS FOR TESTING OF SOLID AND RIGID CENTRALIZERS |
ISO 10427-1:2001 | Petroleum and natural gas industries — Equipment for well cementing — Part 1: Casing bow-spring centralizers |
ISO 10414-2:2011 | Petroleum and natural gas industries Field testing of drilling fluids Part 2: Oil-based fluids |
ISO 10426-2:2003 | Petroleum and natural gas industries — Cements and materials for well cementing — Part 2: Testing of well cements |
ISO 10426-4:2004 | Petroleum and natural gas industries Cements and materials for well cementing Part 4: Preparation and testing of foamed cement slurries at atmospheric pressure |
API 65 : 2002 | CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS |
ISO 10427-3:2003 | Petroleum and natural gas industries — Equipment for well cementing — Part 3: Performance testing of cementing float equipment |
API WORLDWIDE CEMENTING PRACTICES : 1ED 91(R1995) | WORLDWIDE CEMENTING PRACTICES |
API RP 13B-2 : 2014 | RECOMMENDED PRACTICE FOR FIELD TESTING OF OIL-BASED DRILLING FLUIDS |
ISO 10426-6:2008 | Petroleum and natural gas industries — Cements and materials for well cementing — Part 6: Methods for determining the static gel strength of cement formulations |
API 10TR4 : 2008 | SELECTION OF CENTRALIZERS FOR PRIMARY CEMENTING OPERATIONS |
API 53 : 2012 | BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS |
ISO 10414-1:2008 | Petroleum and natural gas industries — Field testing of drilling fluids — Part 1: Water-based fluids |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.