• Shopping Cart
    There are no items in your cart

AS 4292.5-2006

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Railway safety management Operational systems

Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Withdrawn date

18-08-2021

Language(s)

English

Published date

10-11-2006

€74.19
Excluding VAT

1 - AS 4292.5-2006 RAILWAY SAFETY MANAGEMENT - OPERATIONAL SYSTEMS
4 - PREFACE
5 - CONTENTS
7 - FOREWORD
8 - SECTION 1 SCOPE AND GENERAL
8 - 1.1 SCOPE
8 - 1.2 APPLICATION
8 - 1.3 REFERENCED DOCUMENTS
9 - 1.4 DEFINITIONS
9 - 1.4.1 Cross
9 - 1.4.2 Interlocked
9 - 1.4.3 Occupancy authority
9 - 1.4.4 Pass
9 - 1.4.5 Permissible rolling stock outline
9 - 1.4.6 Points and crossings
9 - 1.4.7 Safeworking system
9 - 1.4.8 Shall
9 - 1.4.9 Should
9 - 1.4.10 Track section
10 - 1.4.11 Train controller
10 - 1.4.12 Train crew
10 - 1.4.13 Work site safety supervisor
10 - 1.4.14 Validation
10 - 1.4.15 Verification
10 - 1.5 FUNCTIONAL AREAS
11 - 1.6 ASSET LIFE CYCLE
11 - 1.7 ADOPTION OF EXISTING PRACTICES
11 - 1.8 HAZARD IDENTIFICATION AND RISK ANALYSIS
13 - 1.9 COMMUNICATION
13 - 1.10 HANDLING OF EXCEPTIONS
14 - SECTION 2 INTERFACE COORDINATION
15 - SECTION 3 DESIGN
15 - 3.1 GENERAL
15 - 3.2 SAFEWORKING SYSTEM SELECTION
15 - 3.2.1 Safety level justification
15 - 3.2.2 Selection procedure
15 - 3.2.3 Factors to be considered
16 - 3.3 OPERATIONAL INTEGRITY
16 - 3.3.1 Route integrity
16 - 3.3.2 Train integrity
17 - 3.3.3 Contingency planning
18 - 3.4 CONSTRUCTION SITES
18 - 3.5 SAFETY OF PERSONS
18 - 3.5.1 General requirements
19 - 3.5.2 Factors to be considered
19 - 3.6 VERIFICATION AND VALIDATION
20 - SECTION 4 CONSTRUCTION AND IMPLEMENTATION
20 - 4.1 GENERAL REQUIREMENTS
20 - 4.2 FACTORS TO BE CONSIDERED
20 - 4.3 VERIFICATION AND VALIDATION
21 - SECTION 5 COMMISSIONING
21 - 5.1 GENERAL
21 - 5.2 COMMISSIONING PLAN
22 - SECTION 6 OPERATIONS
22 - 6.1 GENERAL
22 - 6.2 TRAIN MANAGEMENT
22 - 6.3 TRAFFIC MANAGEMENT
23 - SECTION 7 MONITORING AND MAINTENANCE
23 - 7.1 GENERAL
23 - 7.2 INSPECTION AND MAINTENANCE
23 - 7.2.1 General
23 - 7.2.2 Factors to be considered
23 - 7.3 MONITORING OPERATIONAL PERFORMANCE
23 - 7.3.1 General
23 - 7.3.2 Factors to be considered
24 - SECTION 8 MODIFICATION
25 - SECTION 9 DECOMMISSIONING AND DISPOSAL
26 - APPENDIX A - ASSET LIFE CYCLE PHASES-DESCRIPTION AND PROCESS REQUIREMENTS
30 - APPENDIX B - INTERFACES BETWEEN ENGINEERING AND OPERATIONAL FUNCTIONS
34 - APPENDIX C - SAFEWORKING OCCUPANCY CONTROL
34 - C1 GENERAL
34 - C2 SAFETY MANAGEMENT REQUIREMENTS
35 - C3 TYPES OF TRACK OCCUPANCY
35 - C3.1 General
36 - C3.2 Joint occupancy rules
36 - C4 TRANSMISSION, EXECUTION AND FULFILMENT OF OCCUPANCY AUTHORITIES
38 - APPENDIX D - OTHER OPERATIONAL SYSTEMS
39 - APPENDIX E - EXAMPLES OF OCCUPANCY CONTROL SYSTEMS
39 - E1 GENERAL
39 - E2 ELECTRONIC AUTHORITY
39 - E3 CENTRALIZED TRAFFIC CONTROL
39 - E4 AUTOMATIC TRACK SECTION (BLOCK) SIGNALLING
39 - E5 ELECTRIC STAFF
40 - E6 STAFF AND TICKET
40 - E7 TRAIN ORDER WORKING
41 - APPENDIX F - EXAMPLES OF OCCUPANCY AUTHORITIES
41 - F1 GENERAL
41 - F2 DESCRIPTION AND USE
41 - F2.1 Proceed authority (PA)
41 - F2.2 Conditional proceed authority (CPA)
42 - F2.3 Proceed restricted authority (PRA)
42 - F2.4 Work authority (WA)
43 - F2.5 Shunt authority (SHA)
43 - F2.6 Authorities for track workers
43 - F2.7 Local possession authority (LPA)
45 - APPENDIX G - APPLICATION OF JOINT OCCUPANCY RULES
45 - G1 GENERAL
45 - G2 ISSUE OF AUTHORITIES
45 - G3 OTHER TRACK WORK ARRANGEMENTS

Specifies technical requirements for operational systems to be considered for engineering and operating systems safety Standards forming part of a railway safety management system prepared in accordance with AS4292.1.

Committee
ME-079
DocumentType
Standard
ISBN
0 7337 7850 X
Pages
44
ProductNote
Withdrawn 13-08-2021.
PublisherName
Standards Australia
Status
Withdrawn
Supersedes

This Standard specifies requirements and provides guidelines for preparing or adopting engineering and operating systems safety standards and procedures to comply with the relevant requirements of AS 4292.1, in respect of design, installation, operation and maintenance of operational systems.The Standard provides broad, high level principles intended to foster uniformity in railway operational systems ranging from the sophisticated controls required for high volume, high speed heavy rail systems to low volume heavy rail systems and to the special needs of light rail. The breadth of these principles invites them to be interpreted to cover all of the control environments currently existing or likely to develop in the foreseeable future in Australia whilst at the same time ensuring that the essential elements of safe and uniform practice are incorporated within those environments.

Originated as AS 4292.5-1997.
Second edition 2006.

AS 4292.3-2006 Railway safety management Rolling stock
AS 4292.2-2006 Railway safety management Track, civil and electrical infrastructure
AS/NZS 4360:2004 Risk management
AS 4292.4-2006 Railway safety management Signalling and telecommunications systems and equipment
AS 4292.1-2006 Railway safety management General requirements

AS 4292.3-2006 Railway safety management Rolling stock
AS 4292.4-2006 Railway safety management Signalling and telecommunications systems and equipment
AS 4292.2-2006 Railway safety management Track, civil and electrical infrastructure
AS 4292.1-2006 Railway safety management General requirements

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.