• Shopping Cart
    There are no items in your cart

ASHRAE GUIDELINE 1 : 2007

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

THE HVAC COMMISSIONING PROCESS

Available format(s)

Hardcopy , PDF

Superseded date

27-06-2007

Language(s)

Spanish, Castilian

Published date

01-01-2007

€32.30
Excluding VAT

Foreword
1 Purpose
2 Scope
3 Utilization
4 Definitions
5 PROGRAM PHASE
5.1 Introduction
5.2 Program-Phase Procedure
5.3 Systems Manual
6 DESIGN PHASE
6.1 Introduction
6.2 Design-Phase Procedures
7 CONSTRUCTION PHASE
7.1 Introduction
7.2 Construction-Phase Procedures
7.3 Submittals
7.4 Commissioning Plan
7.5 Documentation
8 ACCEPTANCE PHASE
8.1 Introduction
8.2 Prerequisites to Acceptance Procedures
8.3 Verification
8.4 Certificate of Readiness
8.5 Functional Performance Testing
8.6 Documentation
8.7 Final Acceptance
9 POST-ACCEPTANCE COMMISSIONING
9.1 Introduction
9.2 Post-Acceptance Commissioning Requirements and
           Procedures
9.3 Documentation
10 COMMISSIONING EXISTING BUILDINGS
10.1 Introduction
10.2 Program for Existing Buildings
11 OPERATIONS AND MAINTENANCE TRAINING PROGRAM
11.1 Introduction
11.2 Scope of Training
12 COMMISSIONING DOCUMENTATION
12.1 Introduction
12.2 Program-Phase Documentation
12.3 Design-Phase Documentation
12.4 Construction-Phase Documentation
12.5 Acceptance-Phase Documentation
12.6 Systems Manual
12.7 Post-Acceptance-Phase Documentation
13 REFERENCES
ANNEXES
A Discussion of the HVAC Commissioning Process
      1 Introduction
      2 Responsibilities of the Participants in a Sample
           Comprehensive Commissioning Process
      3 Sample Comprehensive HVAC Commissioning Process Flow
           Chart and Organizational Structure
      4 Example Request for Commissioning Services
      5 Sample Preliminary Commissioning Plan
      6 Commissioning Specification
      7 Acceptance-Phase Procedures
B Commissioning an HVAC System: Costs and Benefits of
           the Process
C Indoor Air Quality and HVAC Commissioning
D Energy-Efficiency Reference Information

Describes the commissioning process that will ensure heating, ventilating, and air conditioning (HVAC) systems perform in conformity with design intent.

DocumentType
Standard
Pages
164
PublisherName
American Society of Heating, Refrigerating & Air Conditioning Engineers
Status
Superseded
SupersededBy
Supersedes

ANSI/ASSP Z9.10 : 2017 FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF DILUTION VENTILATION SYSTEMS IN INDUSTRIAL OCCUPANCIES
UFC 3-410-04N : 2004 UNIFIED FACILITIES CRITERIA - INDUSTRIAL VENTILATION
AIHA Z9.10 : 2010 FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF DILUTION VENTILATION SYSTEMS IN INDUSTRIAL OCCUPANCIES
CSA Z204 : 1994(R1999) GUIDELINES FOR MANAGING INDOOR AIR QUALITY IN OFFICE BUILDINGS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.