ASTM D 7186 : 2014 : REDLINE
Current
The latest, up-to-date edition.
Standard Practice for Quality Assurance Observation of Roof Construction and Repair
English
01-11-2014
CONTAINED IN VOL. 04.04, 2015 Specifies procedures for performing visual monitoring of roofing construction to: - Determine guidelines for quality assurance observation practices; and - Describe the role and responsibilities of the quality assurance observer.
Committee |
D 08
|
DocumentType |
Redline
|
Pages |
13
|
PublisherName |
American Society for Testing and Materials
|
Status |
Current
|
1.1This practice covers procedures for performing visual monitoring of roofing construction to:
1.1.1Establish guidelines for quality assurance observation practices; and
1.1.2Define the role and responsibilities of the quality assurance observer.
1.2This practice pertains to quality assurance observation of roofing projects, and the report of information obtained from these observations. This practice is applicable to new construction or reroofing projects involving the installation of a new roof system, the removal of existing roofing and installation of a new roof system, or recovering an existing roof. It is also applicable to roofing projects involving repairs or scheduled maintenance to an existing roof.
1.3This practice contains the following information:
1.3.1The objectives of the quality assurance process;
1.3.2The responsibilities and qualifications of the individual(s) involved in the observations of the roof construction or repair;
1.3.3Identification and use of the basic tools or equipment required for the visual roof observation process; and
1.3.4Monitoring, recording, and reporting procedures.
1.4This practice addresses new construction or repair. This practice does not address the investigation, condition, or analysis of existing roofs.
1.5This practice does not address practices of roof investigation, condition reporting, or analysis of preexisting roofs.
1.6This practice does not pertain to quality control processes or techniques performed by persons or entities representing or under contract to the roofing contractor. The quality control process is separate and distinct from the quality assurance observation process.
1.7Assessment of safe work practices or safety monitoring procedures followed by the contractor is outside the scope of this practice.
1.8This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
ASTM D 7053 : 2007 | Standard Guide for Determining and Evaluating Causes of Water Leakage of Low-Sloped Roofs |
ASTM D 7053/D7053M : 2017 : REDLINE | Standard Guide for Determining and Evaluating Causes of Water Leakage of Low-Sloped Roofs |
ASTM E 631 : 2015 : REDLINE | Standard Terminology of Building Constructions |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.