Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Standard Practice for Visual Inspection of Asbestos Abatement Projects
01-07-2023
English
14-02-2014
CONTAINED IN VOL. 04.11, 2014 Defines procedures for performing visual inspections of asbestos response actions to: - Establish the extent of the required work before it begins; - Determine the progress and quality of the work and evaluate the completeness of the response action; and - Evaluate the cleanliness of the work area prior to final air testing for clearance (if performed), and subsequent to dismantling of critical barriers.
Committee |
D 22
|
DocumentType |
Redline
|
Pages |
15
|
PublisherName |
American Society for Testing and Materials
|
Status |
Superseded
|
SupersededBy |
1.1This practice covers procedures for performing visual inspections of asbestos response actions to:
1.1.1Establish the extent of the required work before it begins;
1.1.2Determine the progress and quality of the work and evaluate the completeness of the response action; and
1.1.3Evaluate the cleanliness of the work area prior to final air testing for clearance (if performed), and subsequent to dismantling of critical barriers.
1.2This practice can be used on an abatement project, or for operations and maintenance (O&M) work, performed by the building owner's staff. It can also be used in conjunction with contract documents between the building owner and other parties involved in an abatement project.
1.3This practice provides the following information:
1.3.1The objectives of the visual inspection process;
1.3.2The responsibilities and qualifications of the individuals involved in the visual inspections;
1.3.3The schedule of visual inspection activities during an abatement project and O&M work;
1.3.4The inspection procedures for the various types of abatement work and O&M tasks; and
1.3.5The criteria for certifying work as complete on the basis of the visual inspections.
1.4The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.
1.5Warning—Asbestos fibers are acknowledged carcinogens. Breathing asbestos fibers can result in disease of the lungs including asbestosis, lung cancer, and mesothelioma. Precautions in this standard practice should be taken to avoid creating and breathing airborne asbestos particles from materials known or suspected to contain asbestos. See 2.2 for regulatory requirements addressing asbestos.
1.6This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific safety statements, see 12.2.
ASTM E 1513 : 1993 : R2011 | Standard Practice for Application of Sprayed Fire-Resistive Materials (SFRMs) |
ASTM E 2394 : 2011 : REDLINE | Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products |
ASTM E 2308 : 2005 | Standard Guide for Limited Asbestos Screens of Buildings (Withdrawn 2014) |
BS EN ISO 16000-7:2007 | Indoor air Sampling strategy for determination of airborne asbestos fibre concentrations |
ASTM E 1513 : 1993 : R2000 | Standard Practice for Application of Sprayed Fire-Resistive Materials (SFRMs) |
ASTM D 7886 : 2014 | Standard Practice for Asbestos Exposure Assessments for Repetitive Maintenance and Installation Tasks |
ISO 16000-7:2007 | Indoor air — Part 7: Sampling strategy for determination of airborne asbestos fibre concentrations |
ASTM E 1513 : 1993 : R2005 : EDT 1 | Standard Practice for Application of Sprayed Fire-Resistive Materials (SFRMs) |
ASTM E 1513/E1513M : 1993 : R2015 : EDT 1 | Standard Practice for Application of Sprayed Fire-Resistive Materials (SFRMs) |
EN ISO 16000-7:2007 | Indoor air - Part 7: Sampling strategy for determination of airborne asbestos fibre concentrations (ISO 16000-7:2007) |
DIN EN ISO 16000-7:2007-11 | Indoor air - Part 7: Sampling strategy for determination of airborne asbestos fibre concentrations (ISO 16000-7:2007) |
ASTM E 631 : 2015 : REDLINE | Standard Terminology of Building Constructions |
CFR 40(PTS790-999) : JUL 2017 | PROTECTION OF ENVIRONMENT - ENVIRONMENTAL PROTECTION AGENCY |
ASTM E 2394 : 2011 : REDLINE | Standard Practice for Maintenance, Renovation and Repair of Installed Asbestos Cement Products |
CFR 29(PT1910.1000 TO END) : 0 | LABOR - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR |
CFR 40(PTS61-62) : JUL 2017 | PROTECTION OF ENVIRONMENT - ENVIRONMENTAL PROTECTION AGENCY |
ASTM D 7521 : 2016 : REDLINE | Standard Test Method for Determination of Asbestos in Soil |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.