• Shopping Cart
    There are no items in your cart

ASTM E 2506 : 2015 : REDLINE

Current

Current

The latest, up-to-date edition.

Standard Guide for Developing a Cost-Effective Risk Mitigation Plan for New and Existing Constructed Facilities

Available format(s)

PDF

Language(s)

English

Published date

01-08-2015

€74.48
Excluding VAT

CONTAINED IN VOL. 04.12, 2015 Defines a generic framework for developing a cost-effective risk mitigation plan for new and existing constructed facilities - buildings, industrial facilities, and other critical infrastructure.

Committee
E 06
DocumentType
Redline
Pages
22
PublisherName
American Society for Testing and Materials
Status
Current

1.1This guide describes a generic framework for developing a cost-effective risk mitigation plan for new and existing constructed facilities—buildings, industrial facilities, and other critical infrastructure. This guide provides owners and managers of constructed facilities, architects, engineers, constructors, other providers of professional services for constructed facilities, and researchers an approach for formulating and evaluating combinations of risk mitigation strategies.

1.2This guide insures that the combinations of mitigation strategies are formulated so that they can be rigorously analyzed with economic tools. Economic tools include evaluation methods, standards that support and guide the application of those methods, and software for implementing the evaluation methods.

1.3The generic framework described in this guide helps decision makers assess the likelihood that their facility and its contents will be damaged from natural and man-made hazards; identify engineering, management, and financial strategies for abating the risk of damages; and use standardized economic evaluation methods to select the most cost-effective combination of risk mitigation strategies to protect their facility.

1.4The purpose of the risk mitigation plan is to provide the most cost-effective reduction in personal injuries, financial losses, and damages to new and existing constructed facilities. Thus, the risk mitigation plan incorporates perspectives from multiple stakeholders—owners and managers, occupants and users, and other affected parties—in addressing natural and man-made hazards.

1.5This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

ASTM E 3130 : 2018 Standard Guide for Developing Cost-Effective Community Resilience Strategies
ASTM E 2103/E2103M : 2013-06 CLASSIFICATION FOR BRIDGE ELEMENTS - UNIFORMAT 2
ASTM E 3008/E3008M : 2016 Standard Classification for Transportation Surface Elements—UNIFORMAT II
ASTM E 2204 : 2015 : REDLINE Standard Guide for Summarizing the Economic Impacts of Building-Related Projects

ASTM E 2103/E2103M : 2013-06 CLASSIFICATION FOR BRIDGE ELEMENTS - UNIFORMAT 2
ASTM E 631 : 2015 : REDLINE Standard Terminology of Building Constructions
ASTM E 1057 : 2015 : REDLINE Standard Practice for Measuring Internal Rate of Return and Adjusted Internal Rate of Return for Investments in Buildings and Building Systems
ASTM E 964 : 2015 : REDLINE Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems
ASTM E 1185 : 2015 : REDLINE Standard Guide for Selecting Economic Methods for Evaluating Investments in Buildings and Building Systems
ASTM E 833 : 2014 : REDLINE Standard Terminology of Building Economics
ASTM E 1369 : 2015 : REDLINE Standard Guide for Selecting Techniques for Treating Uncertainty and Risk in the Economic Evaluation of Buildings and Building Systems
ASTM E 1074 : 2015 : REDLINE Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems
ASTM E 1699 : 2014 : REDLINE Standard Practice for Performing Value Engineering (VE)/Value Analysis (VA) of Projects, Products and Processes
ASTM E 1765 : 2016 : REDLINE Standard Practice for Applying Analytical Hierarchy Process (AHP) to Multiattribute Decision Analysis of Investments Related to Projects, Products, and Processes
ASTM E 917 : 2015-10 PRACTICE FOR MEASURING LIFE-CYCLE COSTS OF BUILDINGS AND BUILDING SYSTEMS
ASTM E 2204 : 2015 : REDLINE Standard Guide for Summarizing the Economic Impacts of Building-Related Projects
ASTM E 1121 : 2015 : REDLINE Standard Practice for Measuring Payback for Investments in Buildings and Building Systems
ASTM E 2166 : 2016 : REDLINE Standard Practice for Organizing and Managing Building Data
ASTM E 1946 : 2012 Standard Practice for Measuring Cost Risk of Buildings and Building Systems and Other Constructed Projects

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.