BEB S12 : 1964 AMD 1 1969
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
STANDARD NUMBERING FOR SMALL WIRING FOR SWITCHGEAR AND TRANSFORMERS TOGETHER WITH THEIR ASSOCIATED RELAY AND CONTROL PANELS
Published date
12-01-2013
Publisher
Superseded date
23-07-2013
Superseded by
Sorry this product is not available in your region.
Standard numbering for small wiring for switchgear and transformers.
| DocumentType |
Standard
|
| PublisherName |
Energy Networks Association (UK)
|
| Status |
Superseded
|
| SupersededBy |
| ESI 37-2 : ISSUE 3 AMD 1 | LV DISTRIBUTION FUSE-BOARDS |
| ESI 41-10 : ISSUE 3 | SWITCHGEAR FOR USE ON 66, 132, 275 AND 400kV SYSTEMS |
| ENA TS 41-15 PT6 : ISSUE 1 1989 | |
| ENA TS 41-15 PT3 : ISSUE 1 1982 | STANDARD CIRCUIT DIAGRAMS FOR EQUIPMENT IN 132 kV SUBSTATIONS - ARRANGEMENTS FOR LOCALLY BANKING TWO TRANSFORMERS - TRANSFORMER END OF A TRANSFORMER-FEEDER |
| ESI 41-15 PT 8 : ISSUE 1 | 132kV BUSBAR STATION - BUSBAR PROTECTION |
| ESI 41-15 PT 9 : ISSUE 1 | AC TRACTION SUPPLIES TO BRITISH RAIL |
| BEB T2 SEC33 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - CONTROL CONNECTIONS, INSTRUMENT WIRING, INTERCONNECTING CABLES, TERMINAL BLOCKS AND FUSES |
| ESI 41-15 PT 4 : ISSUE 1 | 132kV BUSBAR SUBSTATION - FEEDER CIRCUITS |
| ENA TS 41-15 PT1 : ISSUE 1 AMD 1 1991 | STANDARD CIRCUIT DIAGRAMS FOR EQUIPMENT IN 132 KV SUBSTATIONS - TRANSFORMER FEEDER, TRANSFORMER END |
| ESI 41-15 PT 3 : ISSUE 1 | ARRANGEMENTS FOR LOCALLY BANKING TWO TRANSFORMERS. TRANSFORMER END OF A TRANSFORMER-FEEDER |
| BEB T2 SEC25 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - ELECTRICAL CONTROL OF COOLING EQUIPMENT |
| ENA TS 41-15 PT2 : ISSUE 1 1978 | |
| ENA TS 41-15 PT4 : ISSUE 1 1983 | |
| ENA TS 41-15 PT8 : ISSUE 1 1986 | |
| ESI 41-15 PT 6 : ISSUE 1 | BUS SECTION AND BUS COUPLER |
| ENA TS 41-15 PT9 : ISSUE 1 1989 | |
| ESI 35-2 : ISSUE 4 AMD 1 | EMERGENCY RATED SYSTEM TRANSFORMERS - 35/11.5kV DELTA/STAR AND STAR/STAR CONNECTED |
| BEB T2 SEC27 : ISSUE 1 ERRATUM 79 | TRANSFORMERS AND REACTORS - ELECTRICAL CONTROL OF ON-LOAD TAP CHANGE EQUIPMENT |
| ESI 41-15 PT 2 : ISSUE 1 | STANDARD CIRCUIT DIAGRAMS FOR EQUIPMENT IN 132KV SUBSTATIONS - TRANSFORMER FEEDER TRANSFORMER END 132/11/11KV DUAL SECONDARY |
| ESI 41-15 PT 1 : ISSUE 1 | STANDARD CIRCUIT DIAGRAMS FOR EQUIPMENT IN 132KV SUBSTATIONS - TRANSFORMER FEEDER TRANSFORMER END |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.