BEB T2 SEC12 : ISSUE 1 1987
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
TRANSFORMERS AND REACTORS - CABLE BOXES, CABLE SEALING-END CHAMBERS AND DISCONNECTING CHAMBERS
01-02-2016
12-01-2013
Determines the technical requirements, performance, leading dimensions and test requirements for filled and unfilled cable boxes, cable sealing-end chambers and disconnecting chambers for use on transformers.
DocumentType |
Standard
|
PublisherName |
Energy Networks Association (UK)
|
Status |
Withdrawn
|
BEB T2 SEC7 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - OIL-IMMERSED SERIES AND SHUNT REACTORS |
BEB T2 SEC15 : ISSUE 1 AMD 1 1976 | TRANSFORMERS AND REACTORS - TANKS, CONSERVATOR VESSELS AND PRESSURE RELIEF DEVICES |
BEB T2 SEC4 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - OIL-IMMERSED AUXILIARY TRANSFORMERS FOR POWER STATIONS: GENERAL DESIGN AND PERFORMANCE |
BEB T2 SEC11 : ISSUE 1 1976 | TRANSFORMERS AND REACTORS - BUSHINGS AND TERMINALS |
BEB T2 SEC5 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - AIR INSULATED AUXILIARY TRANSFORMERS FOR POWER STATIONS: GENERAL DESIGN AND PERFORMANCE |
BEB T2 SEC5 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - AIR INSULATED AUXILIARY TRANSFORMERS FOR POWER STATIONS: GENERAL DESIGN AND PERFORMANCE |
ENA TS 12-9 : ISSUE 2 AMD 1 1993 | WIPING GLANDS FOR METALLIC-SHEATHED CABLES |
BEB T2 SEC21 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - RATING AND DIAGRAM PLATES, VALVE LOCATION AND FUNCTION PLATES, TERMINAL IDENTIFICATION PLATES AND LABELS |
BS 903-A26:1969 | Physical testing of rubber Determination of hardness |
BEB T2 SEC15 : ISSUE 1 AMD 1 1976 | TRANSFORMERS AND REACTORS - TANKS, CONSERVATOR VESSELS AND PRESSURE RELIEF DEVICES |
BEB T2 SEC29 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - GAS AND OIL-ACTUATED RELAYS |
ENA TS 98-1 : ISSUE 2 2014 | ENVIRONMENTAL CLASSIFICATION AND CORROSION PROTECTION OF STRUCTURES, PLANT AND EQUIPMENT |
BEB T2 SEC16 : ISSUE 1 1982 | TRANSFORMERS AND REACTORS - VALVES, DRAIN AND AIR RELEASE PLUGS AND OIL SAMPLING DEVICES |
BEB T2 SEC4 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - OIL-IMMERSED AUXILIARY TRANSFORMERS FOR POWER STATIONS: GENERAL DESIGN AND PERFORMANCE |
BEB T2 SEC11 : ISSUE 1 1976 | TRANSFORMERS AND REACTORS - BUSHINGS AND TERMINALS |
BEB T2 SEC14 : ISSUE 1 1966 | TRANSFORMERS AND REACTORS - EARTHING SYSTEMS AND CONNECTIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.