BS 7000-4:2013
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Design management systems Guide to managing design in construction
Hardcopy , PDF
31-05-2024
English
31-10-2014
Foreword
0 Introduction
Section 1 - General
1 Scope
2 Normative references
3 Terms and definitions
Section 2 - Framework for design management
4 General
5 Formation and management of the design team
6 Responsibilities
7 Establishing the brief
8 Project plan
9 Process plan
10 Programming
11 Classification
12 Project communications
13 Costs to the client/employer
Section 3 - Design resource management
14 Staff resource
15 Innovation and value management (VM)
16 Technical information
17 Manual, CAD and BIM production
18 Records management
19 Technical equipment
20 Procuring design, surveying and other related services
21 Extracting data requirements
22 Intellectual property and copyright
Section 4: Design process management
23 General
24 Pre-commission review
25 Design brief
26 Design stages
27 Progress validation
28 Design data control
29 Design during construction
30 Monitoring during construction
31 Testing
32 Completion
33 Post occupancy
34 Design management appraisal
Bibliography
Provides guidance on management of the construction design process at all levels, for all organizations and for all types of construction projects.
Committee |
B/555
|
DevelopmentNote |
Supersedes BS 7000-4(1996). (12/2013) Supersedes 12/30240618 DC. (01/2014)
|
DocumentType |
Standard
|
Pages |
46
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
Supersedes |
This part of BS7000 gives guidance on management of the construction design process at all levels, for all organizations and for all types of construction projects. The guidance given is applicable to purpose-built constructions, equipment and components. It is intended for those who work in and with the construction industry, particularly designers and those managing design. Where general management principles are given, they may be adapted to suit any size of design organization or construction project. The guidance given is applicable to management of design activities throughout the life-cycle of a construction project, and the principles of the facilities management function.
This part of BS7000 makes reference to, but does not cover activities prior to client/employer initiation of a project or factors considered by clients/employers when selecting the most appropriate form of construction procurement.
NOTE1 Guidance on the design of manufactured products and services is given in BS7000‑2 and BS7000‑3 respectively.
NOTE2 This part of BS7000 complements BSENISO9001.
BS 8536-1:2015 | Briefing for design and construction Code of practice for facilities management (Buildings infrastructure) |
BS 7000-2:2015 | Design management systems Guide to managing the design of manufactured products |
BS 8536-2:2016 | Briefing for design and construction Code of practice for asset management (Linear and geographical infrastructure) |
BS 8541-6:2015 | Library objects for architecture, engineering and construction Product and facility declarations. Code of practice |
BS 8541-5:2015 | Library objects for architecture, engineering and construction Assemblies. Code of practice |
15/30315620 DC : 0 | BS 8536 - FACILITY MANAGEMENT BRIEFING - CODE OF PRACTICE |
14/30296635 DC : 0 | BS 7000-2 - DESIGN MANAGEMENT SYSTEMS - GUIDE TO MANAGING THE DESIGN OF MANUFACTURED |
15/30296207 DC : DRAFT FEB 2015 | BS 8895-2 - DESIGNING FOR MATERIAL EFFICIENCY IN BUILDING PROJECTS - PART 2: CODE OF PRACTICE FOR CONCEPT DESIGN AND DEVELOPED DESIGN |
BS PAS 8810(2016) : 2016 | TUNNEL DESIGN - DESIGN OF CONCRETE SEGMENTAL TUNNEL LININGS - CODE OF PRACTICE |
16/30333120 DC : 0 | BS 8536-2 - BRIEFING FOR DESIGN AND CONSTRUCTION - PART 2: CODE OF PRACTICE FOR ASSET MANAGEMENT (LINEAR AND GEOGRAPHICAL INFRASTRUCTURE) |
BS 8895-2:2015 | Designing for material efficiency in building projects Code of Practice for concept and developed design |
BS 1192(2007) : 2007 | COLLABORATIVE PRODUCTION OF ARCHITECTURAL, ENGINEERING AND CONSTRUCTION INFORMATION - CODE OF PRACTICE |
BS PAS 1192-2(2013) : 2013 | SPECIFICATION FOR INFORMATION MANAGEMENT FOR THE CAPITAL/DELIVERY PHASE OF CONSTRUCTION PROJECTS USING BUILDING INFORMATION MODELLING |
BS 8534:2011 | Construction procurement policies, strategies and procedures. Code of practice |
BS ISO 15489-1:2016 | Information and documentation. Records management Concepts and principles |
BS EN ISO 9001:2015 | Quality management systems. Requirements |
BS EN ISO 10012:2003 | Measurement management systems. Requirements for measurement processes and measuring equipment |
BIP 0008-2 : 2014 | EVIDENTIAL WEIGHT AND LEGAL ADMISSIBILITY OF INFORMATION TRANSFERRED ELECTRONICALLY: CODE OF PRACTICE FOR THE IMPLEMENTATION OF BS 10008 |
BS 7000-3:1994 | Design management systems Guide to managing service design |
BS 4778-2:1991 | Quality vocabulary Quality concepts and related definitions |
BS ISO 12006-2:2015 | Building construction. Organization of information about construction works Framework for classification |
BS ISO/IEC 27000 : 2016 | INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - INFORMATION SECURITY MANAGEMENT SYSTEMS - OVERVIEW AND VOCABULARY |
BS ISO 16739 : 2013 COR 2017 | INDUSTRY FOUNDATION CLASSES (IFC) FOR DATA SHARING IN THE CONSTRUCTION AND FACILITY MANAGEMENT INDUSTRIES |
BS EN 12973:2000 | Value Management |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.