BS CECC 200000:1993
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Harmonized system of quality assessment for electronic components. Requirements for process assessment schedules for process approval
Hardcopy , PDF
04-11-2009
English
15-08-1993
Contents
Foreword
Preface
Introduction
Section 1: General Introduction
1. General
1.1 CECC 00 114 Part V (RP 14/V)
1.2 Process Assessment Schedules (PASs)
1.3 Audit Check Lists
Section 2: Preparation of Process Assessment Schedules
(PASs)
1. General
2. Requirements for Individual Clauses
2.1 Introductory Information
(a) Front Page
(b) Organizations responsible for preparing a PAS
(c) Foreword
(d) Preface
(e) Contents
(f) Introduction
2.2 General Requirements
(a) Scope
(b) Definitions
(c) Related Documents
(d) Units, Symbols and Terminology
(e) Standard and Preferred Values
2.3 Quality Requirements of the Process/Service
(a) Process Description
(b) Quality Factors
(c) Process Specifications
(d) Process Approval Programmes
(e) Maintenance Programmes
(f) Test Methods
(g) Release to Customer
(h) Modifications to Approval
2.4 Specialist Contractor Documentation Requirement
(a) Process Manual
(b) Process Approval Reports
(c) Abstract of Description of Process Approval
(d) Specialist contractors Audit Preparation Plans
- Internal Audit Preparation Plan
- External Audit Preparation Plan
2.5 Audits
(a) Audit Check Lists
(b) Internal Audits
(c) External Audits
2.6 Corrective Actions and Failure Analysis
(a) Corrective Actions
(b) Failure Analysis
2.7 Contractor to Customer Interface
2.8 Training
2.9 Post Supply Liaison
Annexes
A. Structure of process approval documents
B. Summary of introductory information, sections and
clauses
C. Style form and content of a PAS front page
D. Form and content of process specifications
E. Formulation of process approval programmes
F. Guidelines for guidance to customer documents (GCDs)
G. Guidelines for the generation of customer detail
specifications (CDSs)
H. Notification of drafting a PAS
Prepared for countries (taking part in a harmonized system for electronic components of assessed quality) who want to issue national harmonised specifications for specialist processes and services related to the manufacture of electronic components of assessed quality.
Committee |
W/-
|
DevelopmentNote |
Supersedes 92/32870 DC. (01/2006)
|
DocumentType |
Standard
|
Pages |
30
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
Supersedes |
Standards | Relationship |
CECC 200000 : 1993 | Identical |
BS CECC 00111-0:1994 | Rule of Procedure 11. Specifications An introduction to the types of specifications applicable within the CECC system |
BS CECC 00806:1997 | Harmonized system of quality assessment for electronic components. Guide to total quality management (TQM) for CECC approved organizations |
BS CECC 00114-0:1994 | Rule of procedure 14. Quality assessment procedures An introduction to the types of approval available under the CECC system |
BS CECC 00114-5:1993 | Rule of procedure 14. Quality assessment procedures Process approval of specialist contractors within the electronic components industry |
CECC 00111-0 : 1993 | RULE OF PROCEDURE 11 - SPECIFICATIONS - AN INTRODUCTION TO THE TYPES OF SPECIFICATIONS APPLICABLE WITHIN THE CECC SYSTEM |
BS CECC 00114-5:1993 | Rule of procedure 14. Quality assessment procedures Process approval of specialist contractors within the electronic components industry |
BS CECC 00114-1:1991 | Rule of procedure 14. Quality assessment procedures Approval of manufacturers and other organizations |
BS 9000-2(1996) : 1996 | GENERAL REQUIREMENTS FOR A SYSTEM FOR ELECTRONIC COMPONENTS OF ASSESSED QUALITY - SPECIFICATION FOR THE NATIONAL IMPLEMENTATION OF THE CECC SYSTEM |
BS 5750-0.1(1987) : 1987 | QUALITY SYSTEMS - PRINCIPAL CONCEPTS AND APPLICATIONS - GUIDE TO SELECTION AND USE |
BS 4727(1971) : LATEST | |
BS CECC 00114-0:1992 | Rule of Procedure 14. Quality assessment procedures An introduction to the types of approval available under the CECC System |
BS 5555:1976 | Specification for SI units and recommendations for the use of their multiples and of certain other units |
BS 2011-1:1967 | The enviromental testing of electronic components and electronic equipment. General |
CECC 00401 : 91 AMD 1 | GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM |
CECC 00400 : 86 ERRATUM 92 | HANDBOOK FOR THE PRODUCTION OF CECC DOCUMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.