• BS CECC 00114-1:1991

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Rule of procedure 14. Quality assessment procedures Approval of manufacturers and other organizations

    Available format(s):  Hardcopy, PDF

    Superseded date:  15-05-1993

    Language(s):  English

    Published date:  31-01-1991

    Publisher:  British Standards Institution

    Add To Cart

    Abstract - (Show below) - (Hide below)

    Prescribes the main steps of the procedure which gives the assurance that the components produced under the CECC system satisfy the requirements of the specifications and describes the approval of manufacturers, of distributors and of independent test laboratories.

    General Product Information - (Show below) - (Hide below)

    Committee W/-
    Document Type Standard
    Publisher British Standards Institution
    Status Superseded
    Superseded By

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS CECC 00114-2:1991 Rule of Procedure 14. Quality assessment procedures Qualification approval of electronic components
    BS CECC 200000:1993 Harmonized system of quality assessment for electronic components. Requirements for process assessment schedules for process approval
    BS CECC 00114-0:1992 Rule of Procedure 14. Quality assessment procedures An introduction to the types of approval available under the CECC System
    BS CECC 00114-3:1991 Rule of procedure 14. Quality assessment procedures Capability approval of an electronic component manufacturing activity

    Standards Referencing This Book - (Show below) - (Hide below)

    EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
    EN ISO 9000-1 : 1994 QUALITY MANAGEMENT AND QUALITY ASSURANCE STANDARDS - PART 1: GUIDELINES FOR SELECTION AND USE (ISO 9000-1:1994)
    BS CECC 00114-2:1991 Rule of Procedure 14. Quality assessment procedures Qualification approval of electronic components
    CECC 00107(PT2) : 79 AMD 1 CECC RULES OF PROCEDURE: RP7: QUALITY ASSESSMENT PROCEDURES - PROCEDURE FOR ENHANCED ASSESSMENT OF QUALITY
    EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
    CECC 00107(PT1) : 1982 CECC RULES OF PROCEDURE: RP7: QUALITY ASSESSMENT PROCEDURES - QUALITY ASSESSMENT PROCEDURE FOR GENERAL USAGE
    BS CECC 00114-4:1992 Rule of procedure 14. Quality assessment procedures Procedure for enhanced assessment of quality
    BS CECC 00114-3:1991 Rule of procedure 14. Quality assessment procedures Capability approval of an electronic component manufacturing activity
    EN 45001 : 1989 GENERAL CRITERIA FOR THE OPERATION OF TESTING LABORATORIES
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective