• Shopping Cart
    There are no items in your cart

BS EN 13231-1:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Railway applications. Track. Acceptance of works Works on ballasted track. Plain line, switches and crossings

Available format(s)

Hardcopy , PDF

Superseded date

24-11-2023

Superseded by

BS EN 13231-1:2023

Language(s)

English

Published date

31-05-2013

€271.12
Excluding VAT

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Acceptance of works on plain line and on switches
  and crossings and rail expansion devices
5 Working parameters
6 Acceptance responsibilities
7 Warranty
Annex A (informative) - Guidelines for specification
        of requirements of geodetic measurements
Annex B (informative) - Switches and crossings
        measurements and checks
Bibliography

Defines the minimum technical requirements and the tolerances for the acceptance of works on ballasted track situated on plain line and on switches and crossings and rail expansion devices, as part of the track, for 1435 mm and wider track gauge railways, concerning construction of new track, track renewal and track maintenance.

Committee
RAE/2
DevelopmentNote
Supersedes 03/316446 DC (06/2006) Supersedes BS EN 13231-2 & 11/30241377 DC. (05/2013)
DocumentType
Standard
Pages
34
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

This European Standard specifies the minimum technical requirements and the tolerances for the acceptance of works on ballasted track situated on plain line and on switches and crossings and rail expansion devices, as part of the track, for 1 435 mm and wider track gauge railways, concerning construction of new track, track renewal and track maintenance. More particularly, this standard gives the requirements for the documentation of work parameters, for the tolerances for relative track geometry and absolute track position and for the acceptance procedures.

This standard does not deal with contractual and legal aspects and it does not cover either works related to reprofiling the railhead nor the associated measurements, except for some measurements related to safety, since these works are covered by other parts of EN 13231 series.

Related works, e.g. platform reconstruction, formation, drainage, level crossings are not covered by this standard.

EN 13848-5:2017 Railway applications - Track - Track geometry quality - Part 5: Geometric quality levels - Plain line, switches and crossings
EN 13848-2:2006 Railway applications - Track - Track geometry quality - Part 2: Measuring systems - Track recording vehicles
EN 13848-1:2003+A1:2008 Railway applications - Track - Track geometry quality - Part 1: Characterisation of track geometry
EN 13848-4:2011 Railway applications - Track - Track geometry quality - Part 4: Measuring systems - Manual and lightweight devices
EN 13803-2:2006+A1:2009 Railway applications - Track - Track alignment design parameters - Track gauges 1 435 mm and wider - Part 2: Switches and crossings and comparable alignment design situations with abrupt changes of curvature
EN 13803-1:2010 Railway applications - Track - Track alignment design parameters - Track gauges 1435 mm and wider - Part 1: Plain line
EN 13848-3:2009 Railway applications - Track - Track geometry quality - Part 3: Measuring systems - Track construction and maintenance machines

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.