12/30241409 DC : DRAFT JUNE 2012
|
BS EN 15273-3 - RAILWAY APPLICATIONS - GAUGES - STRUCTURE GAUGES |
DIN EN 13803-1:2011-03
|
RAILWAY APPLICATIONS - TRACK - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 1: PLAIN LINE |
DIN EN 15827:2011-06
|
Railway applications - Requirements for bogies and running gears |
I.S. EN 15827:2011
|
RAILWAY APPLICATIONS - REQUIREMENTS FOR BOGIES AND RUNNING GEARS |
UNE-EN 14363:2017
|
Railway applications - Testing and Simulation for the acceptance of running characteristics of railway vehicles - Running Behaviour and stationary tests |
DIN EN 13231-1 E : 2013
|
RAILWAY APPLICATIONS - TRACK - ACCEPTANCE OF WORKS - PART 1: WORKS ON BALLASTED TRACK - PLAIN LINE, SWITCHES AND CROSSINGS |
I.S. EN 14363:2016
|
RAILWAY APPLICATIONS - TESTING AND SIMULATION FOR THE ACCEPTANCE OF RUNNING CHARACTERISTICS OF RAILWAY VEHICLES - RUNNING BEHAVIOUR AND STATIONARY TESTS |
UNI EN 13803-1 : 2010
|
RAILWAY APPLICATIONS - TRACK - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 1: PLAIN LINE |
09/30208807 DC : 0
|
BS EN 13803-1 - RAILWAY APPLICATIONS - TRACK - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 1: PLAIN LINE |
BS EN 14363:2005
|
Railway applications. Testing for the acceptance of running characteristics of railway vehicles. Testing of running behavior and stationary tests |
BS EN 13231-1:2013
|
Railway applications. Track. Acceptance of works Works on ballasted track. Plain line, switches and crossings |
I.S. EN 13231-1:2013
|
RAILWAY APPLICATIONS - TRACK - ACCEPTANCE OF WORKS - PART 1: WORKS ON BALLASTED TRACK - PLAIN LINE, SWITCHES AND CROSSINGS |
BS EN 15827:2011
|
Railway applications. Requirements for bogies and running gears |
NF EN 13803-1 : 2010
|
RAILWAY APPLICATIONS - TRACK - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 1: PLAIN LINE |
14/30294483 DC : 0
|
BS EN 13232-5 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 5: SWITCHES |
PREN 13232-7 : DRAFT 2014
|
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
PREN 13232-6 : DRAFT 2014
|
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 6: FIXED COMMON AND OBTUSE CROSSINGS |
PREN 14363 : DRAFT 2013
|
RAILWAY APPLICATIONS - TESTING AND SIMULATION FOR THE ACCEPTANCE OF RUNNING CHARACTERISTICS OF RAILWAY VEHICLES - RUNNING BEHAVIOUR AND STATIONARY TESTS |
PREN 13232-5 : DRAFT 2014
|
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 5: SWITCHES |
UNI EN 13231-1 : 2013
|
RAILWAY APPLICATIONS - TRACK - ACCEPTANCE OF WORKS - PART 1: WORKS ON BALLASTED TRACK - PLAIN LINE,SWITCHES AND CROSSINGS |
UNI EN 15827 : 2011
|
RAILWAY APPLICATIONS - REQUIREMENTS FOR BOGIES AND RUNNING GEARS |
UNE-EN 13803-1:2011
|
Railway applications - Track - Track alignment design parameters - Track gauges 1435 mm and wider - Part 1: Plain line |
I.S. EN 13803-1:2010
|
RAILWAY APPLICATIONS - TRACK - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 1: PLAIN LINE |
14/30294498 DC : 0
|
BS EN 13232-6 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 6: FIXED COMMON AND OBTUSE CROSSINGS |
14/30294489 DC : 0
|
BS EN 13232-3 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION |
14/30294504 DC : 0
|
BS EN 13232-7 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
DIN EN 15273-3:2014-06
|
RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES |
I.S. EN 15273-3:2013
|
RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES |
UNE-EN 15827:2011
|
Railway applications - Requirements for bogies and running gears |
EN 13803-1:2010
|
Railway applications - Track - Track alignment design parameters - Track gauges 1435 mm and wider - Part 1: Plain line |
EN 15827:2011
|
Railway applications - Requirements for bogies and running gears |
EN 15273-3:2013+A1:2016
|
Railway applications - Gauges - Part 3: Structure gauges |
13/30250658 DC : 0
|
BS EN 14363 - RAILWAY APPLICATIONS - TESTING AND SIMULATION FOR THE ACCEPTANCE OF RUNNING CHARACTERISTICS OF RAILWAY VEHICLES - RUNNING BEHAVIOUR AND STATIONARY TESTS |
BS EN 15273-3 : 2013
|
RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES |
PREN 13232-3 : DRAFT 2014
|
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION |
BS EN 13803-1:2010
|
Railway applications. Track. Track alignment design parameters. Track gauges 1435 mm and wider Plain line |
DIN EN 13231-1:2013-07
|
Railway applications - Track - Acceptance of works - Part 1: Works on ballasted track - Plain line, switches and crossings |
EN 13231-1:2013
|
Railway applications - Track - Acceptance of works - Part 1: Works on ballasted track - Plain line, switches and crossings |
EN 14363:2016
|
Railway applications - Testing and Simulation for the acceptance of running characteristics of railway vehicles - Running Behaviour and stationary tests |
UNE-EN 15273-3:2014
|
Railway applications - Gauges - Part 3: Structure gauges |