• Shopping Cart
    There are no items in your cart

BS EN 45510-4-6:1999

Current

Current

The latest, up-to-date edition.

Guide for the procurement of power station equipment. Boiler auxiliaries Flue gas desulfurization (De-SOx) plant - Flue gas desulphurization (De-SOx) plant

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

15-09-1999

€165.94
Excluding VAT

Foreword
1. Scope
2. Normative references
3. Definitions
3.1 Organizational terms
3.2 Technical terms
3.3 General terms
4. Brief overall project description
4.1 Role and organization of purchaser
4.2 Site location
4.3 Equipment task
4.4 Equipment to be purchased
4.5 Control and instrumentation
4.6 Electrical supplies and other services
4.7 Other interfaces
4.8 Project programme
4.9 Equipment identification systems
5. Extent of supply
6. Terminal Points
7. Operational requirements
7.1 Operating environment
7.2 Manning levels
7.3 Normal operation
7.4 Operating hours
7.5 Start-up and shut-down
7.6 Abnormal conditions
7.7 Further operational requirements
8. Life expectancy
8.1 Design life
8.2 Components requiring periodic maintenance
9. Performance requirements
9.1 Duty
9.2 Performance
9.3 Equipment margins
9.4 Availability
9.5 Levels fo component redundancy
9.6 Further performance requirements
10. Design and fabrication
10.1 Specific equipment features
10.2 Design justification
10.3 Material selection
10.4 Safety
10.5 Interchangeability
10.6 Fabrication methods
11. Maintenance requirements
11.1 Planned maintenance
11.2 Personnel safety
11.3 Requirements for access
11.4 Lifting requirements
11.5 Special tools
11.6 Test equipment
11.7 Spare parts strategy
11.8 Special precautions
12. Technical documentation requirements
12.1 Tender documentation
12.2 Contract documentation
13. Applicable legislation, regulations, standards
       and further requirements
13.1 Legislation and regulations
13.2 Standards
13.3 Further requirements
14. Evaluation criteria
14.1 General
14.2 Technical criteria
15. Quality measures
15.1 General
15.2 Approvals procedure
15.3 Inspection requirements
15.4 Non-conformity
16. Site factors
16.1 Access
16.2 Facilities
16.3 Site specific requirements
17. Verification of specified performance
17.1 General
17.2 Work tests
17.3 Tests during installation and commissioning
17.4 Technical conditions for trial run
17.5 Functional and performance tests
Annex A (informative) Bibliography

Provides guidance for writing the technical specification for procuring processes and equipment for removing sulfur oxides from the flue gas of steam generating plant to be used in electricity generating stations. Does not apply to equipment used in the nuclear reactor plant area of nuclear power stations. Has not considered other possible applications.

Committee
PEL/99
DevelopmentNote
Reviewed and confirmed by BSI, January 2005. (12/2004) Supersedes 95/700075 DC. (09/2005)
DocumentType
Standard
Pages
20
PublisherName
British Standards Institution
Status
Current
Supersedes

EN 45510-8-1:1998 Guide for procurement of power station equipment - Part 8-1: Control and instrumentation
EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
ISO 8402:1994 Quality management and quality assurance — Vocabulary
EN 45510-8-1:1998 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 8-1: CONTROL AND INSTRUMENTATION
ISO 9002:1994 Quality systems — Model for quality assurance in production, installation and servicing
EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
ISO 9001:2015 Quality management systems — Requirements
EN ISO 8402 : 1995 QUALITY MANAGEMENT AND QUALITY ASSURANCE - VOCABULARY

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.