• Shopping Cart
    There are no items in your cart

BS EN 45510-5-4:1998

Current

Current

The latest, up-to-date edition.

Guide for the procurement of power station equipment Hydraulic turbines, storage pumps and pump-turbines

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

15-05-1998

€165.94
Excluding VAT

Foreword
1 Scope
2 Normative references
3 Definitions
    3.1 Organizational terms
    3.2 Technical terms
    3.3 General terms
4 Brief overall project description
    4.1 Role and organization of purchaser
    4.2 Site location
    4.3 Equipment task
    4.4 Equipment to be purchased
    4.5 Control and instrumentation
    4.6 Electrical supplies and other services
    4.7 Other interfaces
    4.8 Project programme
    4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
    7.1 Operating environment
    7.2 Manning levels
    7.3 Normal operation
    7.4 Operating hours
    7.5 Start-up and shut-down
    7.6 Abnormal conditions
    7.7 Further operational requirements
8 Life expectancy
    8.1 Design life
    8.2 Components requiring periodic maintenance
9 Performance requirements
    9.1 Duty
    9.2 Performance
    9.3 Equipment margins
    9.4 Availability
    9.5 Levels of component redundancy
    9.6 Further performance requirements
10 Design and fabrication
    10.1 Specific equipment features
    10.2 Design justification
    10.3 Material selection
    10.4 Safety
    10.5 Interchangeability
    10.6 Fabrication methods
11 Maintenance requirements
    11.1 Planned maintenance
    11.2 Personnel safety
    11.3 Requirement for access
    11.4 Lifting requirements
    11.5 Special tools
    11.6 Test equipment
    11.7 Spare parts strategy
    11.8 Special precautions
12 Technical documentation requirements
    12.1 Tender documentation
    12.2 Contract documentation
13 Applicable legislation, regulations, standards and
    further requirements
    13.1 Legislation and regulations
    13.2 Standards
    13.3 Further requirements
14 Evaluation criteria
    14.1 General
    14.2 Technical criteria
15 Quality measures
    15.1 General
    15.2 Approvals procedure
    15.3 Inspection requirements
    15.4 Non-conformity
16 Site factors
    16.1 Access
    16.2 Facilities
    16.3 Site specific requirements
17 Verification of specified performance
    17.1 General
    17.2 Works tests
    17.3 Tests during installation and commissioning
    17.4 Technical conditions for trial run
    17.5 Functional and performance tests
Annex A (informative) Bibliography
Annex B (informative) Purpose and extent of documentation

Provides guidance on writing the technical specification for procuring Hydraulic Turbines, Storage Pumps and Pump-Turbines to be used in electricity generating systems (hydraulic power stations). Does not apply to equipment used in the nuclear reactor plant area of nuclear power stations.

Committee
PEL/99
DevelopmentNote
Reviewed and confirmed by BSI, January 2005. (12/2004) Supersedes 95/711916 DC (09/2005)
DocumentType
Standard
Pages
18
PublisherName
British Standards Institution
Status
Current
Supersedes

IEC 60545:1976 Guide for commissioning, operation and maintenance of hydraulic turbines
IEC 60193A:1972 First supplement
EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
IEC 60193:1999 Hydraulic turbines, storage pumps and pump-turbines - Model acceptance tests
IEC 60041:1991 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
IEC 60845:1988 Pre-recorded capacitance grooveless videodisc system 60 Hz/525 lines - NTSC, on type VHD.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.