BS EN 50518-1:2013
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Monitoring and alarm receiving centre Location and construction requirements
Hardcopy , PDF
English
30-09-2014
22-08-2019
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Site selection
5 Construction
6 Alarm systems of ARC
7 Electrical power supplies
Annex A (informative) - Recommendation lock code requirements
Annex B (informative) - Typical ARC layout
Bibliography
Defines the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process.
| Committee |
GW/1/11
|
| DevelopmentNote |
Supersedes 08/30152055 DC. (10/2011) Together with BS 8591(2014), BS EN 50518-2 & BS EN 50518-3 it Supersedes BS 5979(2007). (05/2014)
|
| DocumentType |
Standard
|
| Pages |
26
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
This part of EN50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.
| Standards | Relationship |
| EN 50518-1:2013 | Identical |
| I.S. EN 50518-1:2013 | Equivalent |