• Shopping Cart
    There are no items in your cart

I.S. EN 50518-1:2013

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2013

Withdrawn date

06-02-2022

Superseded by

I.S. EN 50518:2019

€37.00
Excluding VAT
Summarise this standard

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.


Dates of withdrawal of national standards are available from NSAI.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Site selection
5 Construction
6 Alarm systems of ARC
7 Electrical power supplies
Annex A (informative) - Recommendation lock code
        requirements
Annex B (informative) - Typical ARC layout
Bibliography

Defines the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process.

DevelopmentNote
Supersedes I.S. 228. (02/2014)
DocumentType
Standard
Pages
24
PublisherName
National Standards Authority of Ireland
Status
Withdrawn
SupersededBy
Supersedes

Standards Relationship
EN 50518-1:2013 Identical
BS EN 50518-1:2013 Equivalent

⚠

A newer version of this standard is available.

€37.00
Excluding VAT