• CLC/TS 61400-26-3:2017

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    Wind energy generation systems - Part 26-3: Availability for wind power stations

    Available format(s): 

    Withdrawn date:  25-08-2022

    Language(s): 

    Published date:  31-08-2017

    Publisher:  European Committee for Standards - Electrical

    Pure ENs are not available for sale, please purchase a suitable national adoption

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms, definitions and abbreviations
    4 Information model for WPS
    5 INFORMATION AVAILABLE (WPS)
    6 INFORMATION UNAVAILABLE (WPS)
    Annex A (informative) - Entry and Exit condition overview
    Annex B (informative) - Application scenarios - examples
    Annex C (informative) - Balance of plant integration
    Annex D (informative) - Determination of potential production
            for a WPS - examples
    Annex E (informative) - Service availability indicators - examples
    Annex F (informative) - Examples of optional level 5 categories
    Bibliography
    Annex ZA (normative) - Normative references to
             international publications with their
             corresponding European publications

    Abstract - (Show below) - (Hide below)

    IEC TS 61400-26-3:2016(E) provides a framework from which time-based and production-based availability indicators of a wind power station can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive availability indicators. The approach is to apply the terms and definitions for the applied information models introduced in IEC TS 61400-26-1 and IEC TS 61400-26-2 to a wind power station.

    General Product Information - (Show below) - (Hide below)

    Committee CLC/TC 88
    Document Type Technical Specification
    Publisher European Committee for Standards - Electrical
    Status Withdrawn
    Superseded By

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 60050-415:1999 International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems
    CLC/TS 61400-26-2:2017 Wind turbines - Part 26-2: Production-based availability for wind turbines
    IEC 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
    IEEE 762-2006 IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
    IEC TS 61400-26-2:2014 Wind turbines - Part 26-2: Production-based availability for wind turbines
    ISO 3977-9:1999 Gas turbines Procurement Part 9: Reliability, availability, maintainability and safety
    IEC TS 61400-26-1:2011 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
    IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
    IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
    CLC/TS 61400-26-1:2017 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
    IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
    IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements
    IEC 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective