Credit card payment only is accepted for this order because it contains a mix of both publications and training products.
Invalid username/password. Please try again.
xyz
DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 2: SUBMARINES
:
Available format(s): Hardcopy, PDF
Superseded date: 27-06-2008
Language(s): English
Published date: 01-01-2005
Publisher: UK Ministry of Defence Standards
ForewordIntroduction 1 SCOPE 2 WARNING3 RELATED DOCUMENTS 4 DEFINITIONS AND ABBREVIATIONS 5 AMENDMENT6 SPONSORSHIP OF THE REQUIREMENT AND SECURITY 7 INTRODUCTION TO THE PROCESS FOR APPROVAL OF A CERTIFICATE OF SAFETY EXPLOSIVES 7.1 Introduction to the Process 7.2 The JSP 520 process (1st stage) 7.3 The JSP 520/430 Interface 7.4 The JSP 430 process (2nd stage) 7.5 The Generic Naval Environment 7.6 Magazine & Munition Protection Strategy 7.7 Warships In Harbour 7.8 Regulatory DocumentationSECTION 1 - PERFORMANCE REQUIREMENTS, ACOP AND GUIDANCE8 PRINCIPLES FOR THE SAFE STOWAGE, PROTECTION AND HANDLING OF EXPLOSIVE MUNITIONS/STORES IN MOD SUBMARINES 8.1 Description 8.2 Performance Requirements - Basic Principles for the Safety and Protection of WSCs, Magazines and Munitions in MoD Submarines 8.3 ACOP - Relationship of Explosive Safety to Vulnerability Reduction 8.4 ACOP - Basic Principles of Capacity and Size 8.5 ACOP - Basic Principles of for the Safety and Protection of WSCs, Magazines and Munitions 8.6 Guidance - Threat Hazard Assessment and WSC, Magazine and Munition Protection Strategies 8.7 Guidance - Basic Principles for Environmental Hazards 8.8 Guidance - Explosives Compatibility Groups 8.9 Guidance - Assessment of RATTAM Protection 8.10 Guidance - BR 862 and other Safety and Environmental Management Systems (SEMS)9 DESIGNATED DANGER AREAS (DDAs) 9.1 Description 9.2 Performance Requirements for DDAs 9.3 ACOP for DDAs 9.4 ACOP for Marking of Areas around Launchers 9.5 Guidance - DDAs 10 ADJACENT COMPARTMENTS 10.1 Description 10.2 Performance Requirements for Adjacent Compartments 10.3 ACOP for Reduction of Hazards from Adjacent Compartments 10.4 ACOP for POL and Tanks Adjacent to a WSC/Magazine 10.5 ACOP for Smoke/Heat Detectors in Adjacent Compartments 10.6 Guidance - Adjacent Compartments 10.7 Guidance - POL Products in Adjacent Compartments 10.8 Guidance - Smoke/Heat Detectors in Adjacent Compartments11 GENERAL WSC/MAGAZINE CONSTRUCTION REQUIREMENTS 11.1 Description 11.2 Performance Requirements for General WSC/Magazine Construction 11.3 ACOP for Structural Integrity of WSCs/Magazines 11.4 ACOP for General WSC Construction Requirements 11.5 ACOP for Hydraulic Systems in WSCs/Magazines 11.6 ACOP for Air Systems in WSCs/Magazines 11.7 ACOP for Electrical Equipment and System Requirements 11.8 ACOP for Non-Electrical Equipment Requirements in WSCs/Magazines 11.9 ACOP for Painting and Preservation in WSCs/Magazines 11.10 ACOP for Pumping/Flooding Arrangements in WSCs/Magazines 11.11 ACOP for Access to WSCs/Magazines 11.12 ACOP for Emergency Lighting in WSCs/Magazines 11.13 ACOP for Contents of WSCs 11.14 ACOP for Contents of Magazines and Small Magazines 11.15 ACOP for WSC/Magazine Hazard Warning/Safety Signs & Notices 11.16 Guidance - Safety Assessment Within the WSC/Magazine 11.17 Guidance - Use of Flammable Hydraulic Fluids 11.18 Guidance - Pumping/Flooding for WSCs/Magazines 11.19 Guidance - Access to WSCs/Magazines 11.20 Guidance - Emergency Lighting for WSCs/Magazines 11.21 Guidance - Magazine Designed Capacity Lists 11.22 Guidance - Safety Signs and Notices 11.23 Guidance - Use of the WSC for Temporary Accommodation 12 MUNITION STOWAGES AND FITTINGS 12.1 Description 12.2 Performance Requirements for Munition Stowages and Fittings 12.3 ACOP for General Munition Stowage Requirements 12.4 ACOP for Clearance between Stowages and Adjacent Boundaries 12.5 ACOP for Identification of Stowages and Stowage Capacity 12.6 Guidance - Safe Stowage 12.7 Guidance - Clearances between Stowages and Adjacent Boundaries13 EXPLOSIVES STORE LOCKERS (ESL)/MAGAZINE LOCKERS 13.1 Description 13.2 Performance Requirements for ESL/Magazine Locker Design 13.3 Performance Requirements for ESL/Magazine Locker Flooding Arrangements 13.4 Performance Requirements for Siting and Installation of ESLs/Magazine Lockers 13.5 ACOP for ESL/Magazine Locker Design 13.6 ACOP for ESL/Magazine Locker Flooding Arrangements 13.7 ACOP for Siting and Installation of ESLs/Magazine Lockers 13.8 ACOP for Specific Locker Requirements 13.9 ACOP for General Locker Notices and Notice Boards 13.10 ACOP for ESL/Magazine Locker Contents 13.11 Guidance - ESL/Magazine Lockers 13.12 Guidance - Ready Use Magazines/Lockers 14 TORPEDO TUBES, LAUNCH TUBES AND UNDERWATER STORES EJECTOR SYSTEMS 14.1 Description 14.2 Performance Requirements for Tubes and Launchers 14.3 Performance Requirements for Torpedo and Missile Tubes 14.4 Performance Requirements for Underwater Stores Launch/Ejector Tubes 14.5 ACOP for Torpedo and Missile Tubes 14.6 ACOP for Underwater Stores Launch/Ejector Tubes 14.7 ACOP for External Launcher/Ejector Tubes 14.8 Guidance - Torpedo Tubes and Underwater Ejector Systems 14.9 Guidance - External Launcher/Ejector Tubes 15 SPECIAL FORCES (SF) 15.1 Description 15.2 Performance Requirements for Stowage of SF Munitions 15.3 Performance Requirements for Assault Routes 15.4 ACOP for Stowage of SF/EMF Munitions 15.5 ACOP for Assault Routes 15.6 Guidance - Stowage of SF/EMF Munitions in Submarines16 AIR CONDITIONING/VENTILATION SYSTEMS 16.1 Description 16.2 Performance Requirements for Air Conditioning/Ventilation Systems 16.3 ACOP for Environmental Requirements 16.4 ACOP for Ventilation System Design and Installation 16.5 ACOP for Ventilation Trunking 16.6 ACOP for Ventilation Isolation Arrangements 16.7 ACOP for Ventilation Valve - Local and Remote Operating Positions 16.8 ACOP for Ventilation System Notices 16.9 Guidance - Air Conditioning/Ventilation Systems 17 FIRE PREVENTION AND FIRE FIGHTING ARRANGEMENTS 17.1 Description 17.2 Performance Requirements for General Fire Fighting Arrangements 17.3 ACOP for Fire Prevention in Submarine Explosives Areas 17.4 ACOP for Common Principles of Fire Detection and Control Systems 17.5 ACOP for General Principles for WSC Water Fog Systems 17.6 ACOP for WSC Firefighting Systems in S, T and V Class Submarines 17.7 ACOP for WSC Firefighting Systems Water Supply in S, T and V Class Submarines 17.8 ACOP for WSC/Magazine Water Fog System Signs/Notices 17.9 ACOP for First Aid Fire Fighting Equipment in WSC/Magazines 17.10 ACOP for Fire Fighting Arrangements in DDAs 17.11 Guidance - Fire Prevention 17.12 Guidance - Fire Fighting Arrangements - General 17.13 Guidance - Design Requirements for Smoke and Heat Detection 17.14 Guidance - Design Requirements for Spray Coverage 17.15 Guidance - Requirements for Free Air Space 17.16 Guidance - Integration of Fire Alarm Systems 17.17 Guidance - Munition Fire Characteristics 17.18 Guidance on First Aid Fire Fighting Equipment for WSC/Magazines and DDAs 18 MITIGATION METHODS TO PREVENT INITIATION OR REDUCE CONSEQUENCES FROM MUNITION INITIATION EVENTS 18.1 Description 18.2 Performance Requirements for Mitigation Methods 18.3 ACOP for Mitigation Methods in Submarines 18.4 ACOP for Mitigation for Fire 18.5 ACOP for Mitigation for Blast Overpressure and Under Water Shock 18.6 ACOP for Mitigation for Sympathetic Reaction 18.7 ACOP for Mitigation for Rocket Efflux and Propulsive Reaction 18.8 ACOP for Mitigation for Stowage of Shaped Charge Warheads including Demolition Munitions 18.9 ACOP for Mitigation Tests or Assessments 18.10 Guidance - Mitigation Methods in Submarines 18.11 Guidance - Deriving Protection and Mitigation Methods 18.12 Guidance - Corporate Knowledge of Mitigation Techniques 19 SECURITY AND ANTI-SABOTAGE ARRANGEMENTS 19.1 Description 19.2 Performance Requirements for Security and Anti Sabotage 19.3 ACOP for Security of Doors, Hatches, Manholes and Escape Scuttles 19.4 ACOP for Security Arrangements 19.5 Guidance on Security and Anti-Sabotage Arrangements 20 AMMUNITION HANDLING - EMBARKING, STOWING AND SUPPLY 20.1 Description 20.2 Performance Requirements for Ammunition Handling Safety Policy 20.3 Performance Requirements for Ammunition Handling - New Development 20.4 Performance Requirements for Ammunition Routes 20.5 Performance Requirements for Handling/Lifting Equipment 20.6 ACOP for Ammunition Handling 20.7 ACOP for Ammunition Routes 20.8 ACOP for Handling/Lifting Equipment in WSCs/Magazines and DDAs 20.9 ACOP for Ammunition Route Drawings 20.10 Guidance - Ammunition Handling Safety Assessment 20.11 Guidance - Mechanical Handling Equipment in a Submarine Environment 21 PLATFORM DYNAMIC SAFETY HAZARD ASSESSMENT 21.1 Description 21.2 Performance Requirements for Platform Dynamic Safety 21.3 ACOP for Safe Integration of OME Safety Cases into Platform Safety Cases 21.4 Guidance for Safe Integration of OME Safety Cases into Platform Safety Cases 21.5 Guidance on Platform Dynamic Safety for Combat Systems 21.6 Guidance on Platform Dynamic Safety for Missile Systems 21.7 Guidance on Platform Dynamic Safety for Torpedo SystemsSECTION 2 - REGULATIONS 22 GENERAL APPLICATION OF LEGISLATION 23 MOD DISAPPLICATION24 MOD REGULATION ANNEX A - RELATED DOCUMENTS ANNEX B - ABBREVIATIONS ANNEX C - DEFINITIONSANNEX D - THREAT HAZARD ASSESSMENTANNEX E - FORM S285K
Applies to the design, construction and ship fitting of all MOD Ships built to MOD or Classification Society constructional standards and operated by the Royal Navy, Army (including Special Forces), Royal Air Force, RFA or MS.
AUD CAD CHF CNY DKK EUR GBP HKD IDR INR JPY KRW MXN NOK NZD SEK SGD USD ZAR
Unfortunately, this product is not available for purchase in your region.
Features
Get in touch with us
Loading..
A free alerting service to track changes to standards.
Once you've completed your purchase you'll get a link to My Orders on: -the Confirmation page of check out -and by email You'll be able to access your Multi User Orders to add Users.
You have selected more than three (3) participants. Please contact our Customer Service team.
You have already added this product in the cart. If you would like to add additional copies of this product please adjust the Quantity in the cart. For more than 10 copies, please contact our Customer Support team on +353 (0)1 857 6730.
You have selected more than three (3) trainings. Please contact our Customer Service team.Please contact our Customer Service team on Email: sales@saiglobal.com Phone: 131 242 (Within Australia)
You have already added a product with different Currency. Please change the currency.
This product cannot be added to your cart right now. Please contact our Customer Service team on Email: info@standards.iePhone: +353(0)1 857 6730
You have already saved 6 Quotes. Please contact our Customer Service Team.